Measuring life cycle costs for complex B2B products

Purpose The purpose of this paper is to develop a new interdisciplinary methodology to estimate the life cycle cost (LCC) of complex business-to-business products in order to price different types of maintenance contracts and show the applicability of the method in a case study. LCC comprise of initial capital costs as well of operation costs including probabilistic costs (such as the costs of repairs and spare parts), which are directly linked to the maintenance characteristics of the product. Design/methodology/approach The paper proposes an integrated and practical methodology that applies different approaches from different disciplines. Therefore, exponential distributions for failure rates in subsystems, World Bank logistics factors for logistics costs of spare part handling, as well implied credit default probabilities for the counterpart risk in full service leasing contracts are applied. In order to validate the applicability of the proposed methodology to practical problems, the tool is applied in three case studies. Findings The results of the case studies show that this methodology can be applied to analyze LCC structures of engines operating in various regions with regard to different types of engine maintenance contracts. The results also highlight the interplay of technical as well as financial risks. Originality/value Because the literature in maintenance engineering so far either proposes general frameworks to calculate LCC or concentrates on specific aspects of LCC, the paper contributes to the literature in presenting a new interdisciplinary methodology to estimate the LCC.

[1]  Thomas Mikosch,et al.  Non-Life Insurance Mathematics , 2004 .

[2]  Balbir S. Dhillon,et al.  Life Cycle Costing for Engineers , 2009 .

[3]  Ruwen Qin,et al.  A Framework of Cost-Effectiveness Analysis for Alternative Energy Strategies , 2012 .

[4]  Ivan Damnjanovic,et al.  Risk-Based Model for Valuation of Performance-Specified Pavement Maintenance Contracts , 2008 .

[5]  Garland Chow,et al.  Logistics Performance: Definition and Measurement , 1994 .

[6]  Hakan Polatoglu,et al.  Distributions of manufacturer's and user's replacement costs under warranty , 1995 .

[7]  Steven R. Grenadier Leasing and credit risk , 1996 .

[8]  B. Blanchard,et al.  Life-cycle cost and economic analysis , 1991 .

[9]  Alfred E. Thal,et al.  Daylighting Strategies: Life-Cycle Cost Modeling and Policy Implications for Emerging Technology , 2012 .

[10]  Y. Asiedu,et al.  Product life cycle cost analysis: State of the art review , 1998 .

[11]  Herry Nugraha,et al.  Life cycle cost analysis on the operation of power generation , 2013 .

[12]  Lauri Ojala,et al.  Trade Logistics in the Global Economy: The Logistics Performance Index and Its Indicators , 2016 .

[13]  M. Glade,et al.  Life cycle cost impact of using prognostic health management (PHM) for helicopter avionics , 2007, Microelectron. Reliab..

[14]  Nathaniel D. Bastian Optimizing Army Sustainability at Fort Bragg: A Case Study Connecting Life-Cycle Cost Analysis with Leadership in Energy and Environmental Design for Existing Buildings , 2011 .

[15]  Janne Huiskonen,et al.  Maintenance spare parts logistics: Special characteristics and strategic choices , 2001 .

[16]  Dan M. Frangopol,et al.  Life-cycle cost design of deteriorating structures , 1997 .

[17]  R. Jarrow,et al.  Pricing Derivatives on Financial Securities Subject to Credit Risk , 1995 .

[18]  Stanley E. Fawcett,et al.  Logistics Performance Measurement and Customer Success , 1998 .

[19]  David Lando,et al.  Credit Risk Modeling: Theory and Applications , 2004 .

[20]  D. W. Kelly,et al.  Optimizing life cycle cost of complex machinery with rotable modules using simulation , 2005 .

[21]  Stewart C. Myers,et al.  VALUATION OF FINANCIAL LEASE CONTRACTS , 1976 .

[22]  REVISITING LOGISTICAL FRIENDLINESS: PERSPECTIVES OF INTERNATIONAL FREIGHT FORWARDERS. , 1999 .

[23]  D. N. Prabhakar Murthy,et al.  Strategic warranty management: a life-cycle approach , 2000, IEEE Trans. Engineering Management.

[24]  Francesco Saita Value at Risk and Bank Capital Management , 2007 .

[25]  Philip C. Jones,et al.  The Fleet Design Problem , 1993 .

[26]  A. Damodaran Country Risk and Company Exposure: Theory and Practice , 2005 .

[27]  Gino K. Yang,et al.  Pricing policies for services by facilities with Weibull lifetimes , 2013 .

[28]  Sangkee Min,et al.  Development of an energy consumption monitoring procedure for machine tools , 2012 .

[29]  J. R. Brennan,et al.  Warranty cost-risk analysis , 1991, Annual Reliability and Maintainability Symposium. 1991 Proceedings.

[30]  David Sherwin,et al.  A review of overall models for maintenance management , 2000 .

[31]  Tore Markeset,et al.  Maintenance cost evaluation of a system to be used in Arctic conditions: a case study , 2011 .

[32]  Dan M. Frangopol,et al.  Probabilistic models for life‐cycle performance of deteriorating structures: review and future directions , 2004 .

[33]  W. J. Kennedy,et al.  An overview of recent literature on spare parts inventories , 2002 .

[34]  Joseph C. Hartman,et al.  CASE STUDY: BUS FLEET REPLACEMENT , 2004 .

[35]  Masoud Rabbani,et al.  Component based life cycle costing in replacement decisions , 2014 .

[36]  P. Murphy,et al.  Profiling international freight forwarders: an update , 2001 .