Medium Term Production Management for Cyclic Deliveries
暂无分享,去创建一个
[1] Suresh Kumar Goyal,et al. On lot streaming in multistage production systems , 2005 .
[2] Fayez F. Boctor. A more efficient formulation of the single machine, static demand, lot scheduling problem , 1988 .
[3] Hugh F. Durrant-Whyte,et al. On the role of process models in autonomous land vehicle navigation systems , 2003, IEEE Trans. Robotics Autom..
[4] S. T. Mccormick,et al. Some complexity results in cyclic scheduling , 1994 .
[5] Gyana R. Parija,et al. An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .
[6] Tae-Eog Lee,et al. The complexity of cyclic shop scheduling problems , 2002 .
[7] Loo Hay Lee,et al. Production , Manufacturing and Logistics A dynamic joint replenishment policy with auto-correlated demand , 2005 .
[8] Peter Brucker,et al. Tabu Search Algorithms for Cyclic Machine Scheduling Problems , 2005, J. Sched..
[9] M. A. Hoque,et al. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..
[10] Paul H. Zipkin. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..
[11] John I. S. Hsu,et al. Common cycle scheduling in a multistage production process , 1990 .
[12] Zied Bahroun. Contribution à la planification et à la gestion dynamique des systèmes de production cyclique , 2000 .
[13] Ouajdi Korbaa,et al. Cyclic scheduling for F.M.S.: Modelling and evolutionary solving approach , 2008, Eur. J. Oper. Res..
[14] Jean-Marie Proth,et al. Optimization of cyclic production systems: a heuristic approach , 2003, IEEE Trans. Robotics Autom..
[15] Suresh Chand,et al. Single machine scheduling to minimize weighted earliness subject to no tardy jobs , 1988 .
[16] Suresh Kumar Goyal,et al. A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .
[17] J. A. Muckstadt,et al. An approach to production planning and scheduling in cyclically scheduled manufacturing systems , 1994 .
[18] Candace Arai Yano,et al. Cyclic scheduling to minimize inventory in a batch flow line , 1994 .
[19] William L. Maxwell,et al. Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems , 1985, Oper. Res..
[20] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[21] H. C. Co,et al. Performance and R&D expenditures in American and Japanese manufacturing firms , 1997 .
[22] Jean-Claude Hennet,et al. A common cycle approach to lot-scheduling in multistage manufacturing systems , 2001 .
[23] Bhaba R. Sarker,et al. Cyclic Scheduling for a Multi-product, Single-facility Production System Operating Under a Just-in-time Delivery Policy , 1996 .
[24] Peter A. Pinto,et al. Integrative Cycle Scheduling Approach for a Capacitated Flexible Assembly System , 1993 .
[25] Gerard M. Campbell,et al. Cyclic Assembly Schedules for Dynamic Demands , 1996 .
[26] Chengbin Chu,et al. Multi-degree cyclic scheduling of two robots in a no-wait flowshop , 2005, IEEE Transactions on Automation Science and Engineering.
[27] Dan Wu,et al. Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation , 2004, Comput. Chem. Eng..
[28] R. Ramesh,et al. Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment , 2001 .
[29] Suresh Goyal,et al. A review of the joint replenishment problem literature: 1989-2005 , 2008, Eur. J. Oper. Res..
[30] Mustapha Cheurfa,et al. Gestion des ressources humaines en production cyclique , 2005 .
[31] Anders Segerstedt,et al. A new iterative heuristic to solve the joint replenishment problem using a spreadsheet technique , 2007 .
[32] I. Karimi. Optimal Cycle Times in a Two-Stage Serial System With Set-Up and Inventory Costs , 1989 .
[33] Rémy Dupas,et al. A genetic approach to solving the problem of cyclic job shop scheduling with linear constraints , 2005, Eur. J. Oper. Res..
[34] M. K. El-Najdawi. Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes , 1997 .
[35] Roger M. Hill. Optimizing a Production System with a Fixed Delivery Schedule , 1996 .
[36] Suresh Kumar Goyal,et al. An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .
[37] Edward A. Silver. Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate , 1995 .
[38] Mohamed Moalla,et al. Production planning and scheduling in the context of cyclic delivery schedules , 1999 .
[39] Robert W. Hall. Cyclic scheduling for improvement , 1988 .
[40] Vincent A. Mabert,et al. Cyclical schedules for capacitated lot sizing with dynamic demands , 1991 .
[41] Chelliah Sriskandarajah,et al. The complexity of scheduling jobs in repetitive manufacturing systems , 1993 .
[42] Gary L. Hogg,et al. Backtracking and its Amoebic Properties in One-dimensional Machine Location Problems , 1994 .
[43] Vincent A. Mabert,et al. Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems , 1995 .
[44] G. Laporte,et al. Models and algorithms for the dynamic-demand joint replenishment problem , 2004 .
[45] John O. McClain,et al. Cyclic Assembly Schedules , 1985 .
[46] Lazaros G. Papageorgiou,et al. A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants , 2004, Comput. Chem. Eng..
[47] Gerard M. Campbell,et al. Cyclical schedules for the joint replenishment problem with dynamic demands , 1997 .
[48] Chung-Hsing Yeh,et al. Modeling subjective evaluation for fuzzy group multicriteria decision making , 2009, Eur. J. Oper. Res..