Multi-criteria decision making on strategic selection of wind farms
暂无分享,去创建一个
[1] David England,et al. Uncovering the trends in project management: Journal emphases over the last 10 years , 2006 .
[2] G. Destouni,et al. Renewable Energy , 2010, AMBIO.
[3] Thomas L. Saaty,et al. Marketing Applications of the Analytic Hierarchy Process , 1980 .
[4] Julio Usaola,et al. Optimal controllability of wind generators in a delegated dispatch , 2007 .
[5] Paul A. Steenhof,et al. Factors affecting electricity generation in China: Current situation and prospects , 2007 .
[6] Jan Terje Karlsen,et al. Perspectives on project management , 2007 .
[7] A.M. Knight,et al. A review of power converter topologies for wind generators , 2005, IEEE International Conference on Electric Machines and Drives, 2005..
[8] W. Vermeulen,et al. Social barriers in wind power implementation in The Netherlands: Perceptions of wind power entrepreneurs and local civil servants of institutional and social conditions in realizing wind power projects , 2007 .
[9] Thomas L. Saaty,et al. Fundamentals of the analytic network process — multiple networks with benefits, costs, opportunities and risks , 2004 .
[10] Danny Pudjianto,et al. Impact of wind generation on the operation and development of the UK electricity systems , 2007 .
[11] A. Jobert,et al. Local acceptance of wind energy: Factors of success identified in French and German case studies , 2007 .
[12] Christian Gollier,et al. Choice of Nuclear Power Investments under Price Uncertainty: Valuing Modularity , 2005 .
[13] ZhongXiang Zhang,et al. China is moving away the pattern of “develop first and then treat the pollution” , 2007 .
[14] Mark Raymont. Timely Boost for Renewables in China , 2006 .
[15] Can Wang,et al. The promotion of sustainable development in China through the optimization of a tax/subsidy plan among HFC and power generation CDM projects , 2007 .
[16] Amy H. I. Lee,et al. A fuzzy AHP evaluation model for buyer–supplier relationships with the consideration of benefits, opportunities, costs and risks , 2009 .
[17] Prasanta Kumar Dey,et al. Integrated project evaluation and selection using multiple-attribute decision-making technique , 2006 .
[18] ZhongXiang Zhang. China is moving away the pattern of , 2007 .
[19] S. Iniyan,et al. A review of wind energy technologies , 2007 .
[20] Dominic Moran,et al. An economic assessment of windfarm power generation in Scotland including externalities , 2007 .
[21] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[22] H I LeeAmy. A fuzzy supplier selection model with the consideration of benefits, opportunities, costs and risks , 2009 .
[23] Wen-Lin Tzeng,et al. A study on the effectiveness of the most advantageous tendering method in the public works of Taiwan , 2006 .
[24] Earl P. N. Duque,et al. Wind resource assessment in the state of Arizona: Inventory, capacity factor, and cost , 2007 .
[25] Onder Ozgener,et al. Exergy and reliability analysis of wind turbine systems: A case study , 2007 .
[26] H. H. Chen,et al. Operations management of new project development: innovation, efficient, effective aspects , 2009, J. Oper. Res. Soc..
[27] Thomas L. Saaty,et al. Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .