Reliability optimization problems with multiple constraints under fuzziness

In reliability optimization problems diverse situation occurs due to which it is not always possible to get relevant precision in system reliability. The imprecision in data can often be represented by triangular fuzzy numbers. In this manuscript, we have considered different fuzzy environment for reliability optimization problem of redundancy. We formulate a redundancy allocation problem for a hypothetical series-parallel system in which the parameters of the system are fuzzy. Two different cases are then formulated as non-linear programming problem and the fuzzy nature is defuzzified into crisp problems using three different defuzzification methods viz. ranking function, graded mean integration value and α-cut. The result of the methods is compared at the end of the manuscript using a numerical example.

[1]  C. S. Sung,et al.  Reliability optimization of a series system with multiple-choice and budget constraints , 2000, Eur. J. Oper. Res..

[2]  Tapan Kumar Roy,et al.  Fuzzy multi-objective mathematical programming on reliability optimization model , 2006, Appl. Math. Comput..

[3]  Hong-Zhong Huang,et al.  Fuzzy multi-objective optimization decision-making of reliability of series system , 1997 .

[4]  Arun K. Bhunia,et al.  An Application of Integer Linear Programming Problem in Tea Industry of Barak Valley of Assam, India under Crisp and Fuzzy Environments , 2014 .

[5]  G. Bortolan,et al.  A review of some methods for ranking fuzzy subsets , 1985 .

[6]  M. Srinivasa Rao,et al.  Reliability analysis of repairable systems using system dynamics modeling and simulation , 2014 .

[7]  H. Meglouli,et al.  Reliability assessment of power distribution systems using disjoint path-set algorithm , 2015 .

[8]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[9]  S. H. Chen,et al.  GRADED MEAN INTEGRATION REPRESENTATION OF GENERALIZED FUZZY NUMBER , 1999 .

[10]  Jagdeep Kaur,et al.  A New Method for Solving Fuzzy Linear Programs with Trapezoidal Fuzzy Numbers , 2011 .

[11]  Maw-Sheng Chern,et al.  Reliability Optimization Problems with Multiple Constraints , 1986, IEEE Transactions on Reliability.

[12]  Tapan Kumar Roy,et al.  Reliability Evaluation using Triangular Intuitionistic Fuzzy Numbers Arithmetic Operations , 2009 .

[13]  A. Saidane,et al.  Optimal Reliability Design: Fundamentals and Applications , 2001 .

[14]  Tapan Kumar Roy,et al.  Multiobjective Transportation Model with Fuzzy Parameters: Priority based Fuzzy Goal Programming Approach , 2008 .

[15]  K. B. Misra,et al.  On Optimal Reliability Design: A Review , 1975 .

[16]  Maghsoud Amiri,et al.  Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using efficient epsilon-constraint, multi-start partial bound enumeration algorithm, and DEA , 2012, Reliab. Eng. Syst. Saf..

[17]  Madjid Tavana,et al.  A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems , 2013, Reliab. Eng. Syst. Saf..

[18]  Mao-Jiun J. Wang,et al.  Ranking fuzzy numbers with integral value , 1992 .

[19]  D. H. Silvern Optimization of system reliability , 1963 .

[20]  C. R. Bector,et al.  Fuzzy Mathematical Programming and Fuzzy Matrix Games , 2005 .

[21]  Shashi Aggarwal,et al.  Fully Fuzzy Multi-Choice Multi-Objective Linear Programming Solution via Deviation Degree , 2013 .

[22]  G. S. Mahapatra,et al.  Optimal Redundancy Allocation in Series-Parallel System using Generalized Fuzzy Number , 2011 .

[23]  Houshang Taghizadeh,et al.  The investigation of supply chain's reliability measure: a case study , 2012 .

[24]  Ryoichi Sasaki,et al.  A New Technique to Optimize System Reliability , 1983, IEEE Transactions on Reliability.

[25]  Ibrahim Yusuf,et al.  Comparative analysis of profit between three dissimilar repairable redundant systems using supporting external device for operation , 2014 .

[26]  Kaveh Khalili Damghani,et al.  Design of SCADA water resource management control center by a bi-objective redundancy allocation problem and particle swarm optimization , 2015, Reliab. Eng. Syst. Saf..

[27]  Madjid Tavana,et al.  A Decision Support System for Solving Multi‐Objective Redundancy Allocation Problems , 2014, Qual. Reliab. Eng. Int..

[28]  Kyung S. Park Fuzzy Apportionment of System Reliability , 1987, IEEE Transactions on Reliability.