A methodology for simultaneous optimisation of design parameters for the preventive maintenance and quality policy incorporating Taguchi loss function

The performance of a production system depends on the breakdown-free operation of equipment and processes. Maintenance and quality control play an important role in achieving this goal. In addition to deteriorating with time, equipment may experience a quality shift (i.e. process moves to out-of-control state), which is characterised by a higher rejection rate and a higher tendency to fail. This paper develops an integrated model for joint optimisation of preventive maintenance interval and control parameters incorporating the Taguchi loss function. We consider two types of maintenance policies: minimal corrective maintenance that maintains the state of the equipment without affecting the age and imperfect preventive maintenance that upgrades the equipment in between ‘as good as new’ and ‘as bad as old’ condition. The proposed model enables the determination of the optimal value of each of the four decision variables, i.e. sample size (n), sample frequency (h), control limit coefficient (k), and preventive maintenance interval (t PM) that minimises the expected total cost of the integration per unit time. A numerical example is presented to demonstrate the effect of the cost parameters on the joint economic design of preventive maintenance and process quality control policy. The sensitivity of the various parameters is also examined.

[1]  Mohamed Ben-Daya,et al.  Effect of maintenance on the economic design of x-control chart , 2000, Eur. J. Oper. Res..

[2]  Sofia Panagiotidou,et al.  Optimal preventive maintenance for equipment with two quality states and general failure time distributions , 2007, Eur. J. Oper. Res..

[3]  C. Richard Cassady,et al.  Simultaneous optimization of [Xbar] control chart and age-based preventive maintenance policies under an economic objective , 2007 .

[4]  Bhupesh Kumar Lad,et al.  Integrated reliability and optimal maintenance schedule design : a Life Cycle Cost based approach , 2008 .

[5]  Suraj M. Alexander,et al.  Economic design of control charts using the Taguchi loss function , 1995 .

[6]  Wen-Hui Zhou,et al.  Economic design of integrated model of control chart and maintenance management , 2008, Math. Comput. Model..

[7]  M. A. Rahim Economic design of X control charts assuming Weibull in-control times , 1993 .

[8]  K. T. Lee,et al.  An economic design of variable sampling interval control charts , 1998 .

[9]  Yarlin Kuo,et al.  Optimal adaptive control policy for joint machine maintenance and product quality control , 2006, Eur. J. Oper. Res..

[10]  George Nenes,et al.  The economically designed two-sided Bayesian I control chart , 2007, Eur. J. Oper. Res..

[11]  M. Kijima SOME RESULTS FOR REPAIRABLE SYSTEMS WITH GENERAL REPAIR , 1989 .

[12]  John J. Black,et al.  Simulation of complex manufacturing equipment reliability using object oriented methods , 1995 .

[13]  C. Richard Cassady,et al.  A generic model of equipment availability under imperfect maintenance , 2005, IEEE Transactions on Reliability.

[14]  Huan‐Neng Chiu,et al.  The economic design of x‐ control charts under a preventive maintenance policy , 1996 .

[15]  M. A. Rahim,et al.  INTEGRATED PRODUCTION, QUALITY & MAINTENANCE MODELS: AN OVERVIEW , 2001 .

[16]  David Sherwin,et al.  A review of overall models for maintenance management , 2000 .

[17]  Sofia Panagiotidou,et al.  An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart , 2009, Reliab. Eng. Syst. Saf..

[18]  Kevin W. Linderman,et al.  An integrated systems approach to process control and maintenance , 2005, Eur. J. Oper. Res..

[19]  Divya Pandey,et al.  Joint consideration of production scheduling, maintenance and quality policies: a review and conceptual framework , 2010, Int. J. Adv. Oper. Manag..

[20]  Amik Garg,et al.  Maintenance management: literature review and directions , 2006 .

[21]  M. Ben-Daya Integrated production maintenance and quality model for imperfect processes , 1999 .

[22]  M. A. Rahim JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN , 1994 .

[23]  C. Richard Cassady,et al.  Combining preventive maintenance and statistical process control: a preliminary investigation , 2000 .

[24]  Bhupesh Kumar Lad,et al.  A parameter estimation method for machine tool reliability analysis using expert judgement , 2010, Int. J. Data Anal. Tech. Strateg..

[25]  Sofia Panagiotidou,et al.  Evaluation of maintenance policies for equipment subject to quality shifts and failures , 2008 .

[26]  Acheson J. Duncan,et al.  The Economic Design of X Charts Used to Maintain Current Control of a Process , 1956 .

[27]  Mohamed Ben-Daya,et al.  Integrated models in production planning, inventory, quality, and maintenance , 2001 .

[28]  Vince Thomson,et al.  A review of research on cost of quality models and best practices , 2006 .

[29]  Wenbin Wang,et al.  Maintenance models based on the np control charts with respect to the sampling interval , 2011, J. Oper. Res. Soc..

[30]  Adnan Hassan,et al.  Issues in quality engineering research , 2000 .

[31]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[32]  Salih O. Duffuaa,et al.  Maintenance and quality: the missing link , 1995 .