A Cooperative Game Based Approach for Resource Pooling and Profit Sharing in Supply Chains

Abstract This study addresses the strategic problem of supply chain formation on the basis of the quantities and prices of end-products to be manufactured and sold on a market. The manufacturing process is planned from the products bills of materials (BOM) and distributed on the resources available in the enterprises network. Resources are modeled as capacitated systems with piecewise-linear throughput functions of the workload. The problem of maximal profit generation and sharing among the firms of the network is analyzed and solved as a cooperative game. The proposed profit sharing rule is constructed from the dual of the profit maximization problem. It is both efficient and rational, with more fairness than the Owen rule of classical Linear Production Games. Copyright © 2012 IFAC

[1]  L. Shapley,et al.  The assignment game I: The core , 1971 .

[2]  Erik Elmroth,et al.  The Cloud Supply Chain : A Framework for Information, Monitoring, Accounting and Billing , 2011, CloudCom 2011.

[3]  Mahesh Nagarajan,et al.  Game-Theoretic Analysis of Cooperation Among Supply Chain Agents: Review and Extensions , 2008, Eur. J. Oper. Res..

[4]  E. J. Anderson,et al.  Deterministic Lotsizing Models for Production Planning , 1991 .

[5]  Shang Zhi,et al.  A proof of the queueing formula: L=λW , 2001 .

[6]  Jean-Claude Hennet,et al.  Toward the fair sharing of profit in a supply network formation , 2010 .

[7]  Andrew Vazsonyi,et al.  The Use of Mathematics in Production and Inventory Control , 1954 .

[8]  Stef Tijs,et al.  Characterization of the Owen Set of Linear Production Processes , 2000, Games Econ. Behav..

[9]  Gérard P. Cachon,et al.  Game Theory in Supply Chain Analysis , 2004 .

[10]  Jean-Claude Hennet,et al.  A bimodal scheme for multi-stage production and inventory control , 2003, Autom..

[11]  Jakob Asmundsson,et al.  Tractable Nonlinear Capacity Models for Production Planning Part I : Modelling and Formulations , 2002 .

[12]  Uday S. Karmarkar,et al.  Chapter 6 Manufacturing lead times, order release and capacity loading , 1993, Logistics of Production and Inventory.

[13]  Ariel Rubinstein,et al.  A Course in Game Theory , 1995 .

[14]  Guillermo Owen,et al.  On the core of linear production games , 1975, Math. Program..

[15]  J. Little A Proof for the Queuing Formula: L = λW , 1961 .

[16]  Khaled Hadj-Hamou,et al.  Product Family and Supply Chain Design , 2005 .

[17]  Kenneth R. Baker,et al.  Chapter 11 Requirements planning , 1993, Logistics of Production and Inventory.