The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified “hot spot” cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: 1) performing radiological walkover surveys, and 2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site was removed in its entirety.