A linear‐discrete scheduling model for the resource‐constrained project scheduling problem
暂无分享,去创建一个
[1] V. K. Handa,et al. Linear scheduling using optimal control theory , 1986 .
[2] O Moselhi,et al. Optimized Scheduling of Linear Projects , 2003 .
[3] James F. Allen. Maintaining knowledge about temporal intervals , 1983, CACM.
[4] Robert C. Newbold,et al. Project Management in the Fast Lane: Applying the Theory of Constraints , 1998 .
[5] Sönke Hartmann. Project Scheduling under Limited Resources: Models, Methods, and Applications , 2000 .
[6] Donncha Kavanagh. Siren: a repetitive construction simulation model , 1985 .
[7] Khaled A El-Rayes,et al. Scheduling of repetitive projects with cost optimization , 1993 .
[8] David B. Ashley. Simulation of Repetitive-Unit Construction , 1980 .
[9] Richard Neale,et al. CPM/LOB: New Methodology to Integrate CPM and Line of Balance , 1994 .
[10] James E. Rowings,et al. Linear Scheduling Model: Development of Controlling Activity Path , 1998 .
[11] Rehab Reda,et al. RPM: Repetitive Project Modeling , 1990 .
[12] Shlomo Selinger. Construction Planning for Linear Projects , 1980 .
[13] David W. Johnston. LINEAR SCHEDULING METHOD FOR HIGHWAY CONSTRUCTION , 1981 .
[14] Khaled A El-Rayes,et al. Resource-driven scheduling of repetitive activities , 1998 .
[15] Khaled A El-Rayes. Object-Oriented Model for Repetitive Construction Scheduling , 2001 .
[16] Alan D. Russell,et al. New Generation of Planning Structures , 1993 .
[17] L Sou Sen,et al. OPTIMAL REPETITIVE SCHEDULING MODEL WITH SHAREABLE RESOURCE CONSTRAINT , 2001 .
[18] David W. Johnston,et al. Application of Linear Scheduling , 1986 .
[19] Ahmed Senouci,et al. Scheduling and control of linear projects , 1994 .
[20] Alexander H. Levis,et al. TEMPER: a temporal programmer for time-sensitive control of discrete event systems , 2001, IEEE Trans. Syst. Man Cybern. Part A.
[21] David J. Harmelink. Linear scheduling model: float characteristics , 2001 .
[22] James J. O'Brien,et al. Network scheduling variations for repetitive work , 1985 .
[23] Khaled A El-Rayes,et al. An object-oriented model for planning and control of housing construction , 2002 .
[24] Khaled A El-Rayes,et al. Optimizing Resource Utilization for Repetitive Construction Projects , 2001 .
[25] Alan D. Russell,et al. Extensions to Linear Scheduling Optimization , 1988 .
[26] Neil N. Eldin,et al. Scheduling of linear projects with single loop structures , 2000 .