Case study: A dual-primary redundant automatic decoupling system for a critical petrochemical process

Gulf Petrochemical Industries Company (GPIC), located in Sitra, Kingdom of Bahrain, operates a petrochemical complex consisting of a 1200 MTPD (metric tons per day) ammonia plant, a 1200 MTPD methanol plant, and a 1700 MTPD urea plant.

[1]  W. Allen,et al.  Flexible High-Speed Load Shedding Using a Crosspoint Switch , 2006, 2006 Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources.

[2]  Daqing Hou,et al.  Out-of-step protection fundamentals and advancements , 2004, 57th Annual Conference for Protective Relay Engineers, 2004.