Probabilistic Assessment of Spinning Reserve via Cross-Entropy Method Considering Renewable Sources and Transmission Restrictions
暂无分享,去创建一个
[1] Mark O'Malley,et al. Reserves in Stochastic Unit Commitment: An Irish System Case Study , 2015, IEEE Transactions on Sustainable Energy.
[2] Armando Martins Leite da Silva,et al. Spinning Reserve Assessment Under Transmission Constraints Based on Cross-Entropy Method , 2016, IEEE Transactions on Power Systems.
[3] Roy Billinton,et al. Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .
[4] A.M.L. da Silva,et al. Generating Capacity Reliability Evaluation Based on Monte Carlo Simulation and Cross-Entropy Methods , 2010, IEEE Transactions on Power Systems.
[5] Singh Maninder. IEEE Reliability Test System (RTS) of 1996 (Available in Hypersim) , 2016 .
[6] Armando M. Leite da Silva,et al. Reliability Assessment of Time-Dependent Systems via Sequential Cross-Entropy Monte Carlo Simulation , 2011, IEEE Transactions on Power Systems.
[7] L. T. Anstine,et al. Application of Probability Methods to the Determination of Spinning Reserve Requirements for the Pennsylvania-New Jersey-Maryland Interconnection , 1963 .
[8] Daniel S. Kirschen,et al. Estimating the Spinning Reserve Requirements in Systems With Significant Wind Power Generation Penetration , 2009, IEEE Transactions on Power Systems.
[9] Ozan Erdinc,et al. Qualification and Quantification of Reserves in Power Systems Under High Wind Generation Penetration Considering Demand Response , 2015, IEEE Transactions on Sustainable Energy.
[10] H. Monsef,et al. Scheduling of Spinning Reserve Considering Customer Choice on Reliability , 2009, IEEE Transactions on Power Systems.
[11] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[12] A. M. Leite da Silva,et al. Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation , 1994 .
[13] Warlley S. Sales,et al. Reliability assessment of time-dependent systems via quasi-sequential Monte Carlo simulation , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.
[14] Roy Billinton,et al. Composite system spinning reserve assessment in interconnected systems , 1995 .
[15] D. Kirschen,et al. Optimal scheduling of spinning reserve , 1999 .
[16] Armando M. Leite da Silva,et al. Spinning reserve assessment via quasi-sequential Monte Carlo simulation with renewable sources , 2016, 2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS).
[17] Wenyuan Li,et al. Risk Assessment Of Power Systems: Models, Methods, and Applications , 2004 .
[18] Roy Billinton,et al. Operating reserve risk assessment in composite power systems , 1994 .
[19] Chuangxin Guo,et al. A Cross-Entropy-Based Three-Stage Sequential Importance Sampling for Composite Power System Short-Term Reliability Evaluation , 2013, IEEE Transactions on Power Systems.
[20] Dirk P. Kroese,et al. The Cross-Entropy Method: A Unified Approach to Combinatorial Optimization, Monte-Carlo Simulation and Machine Learning , 2004 .
[21] Kory W. Hedman,et al. Reserve Requirements to Efficiently Manage Intra-Zonal Congestion , 2014, IEEE Transactions on Power Systems.
[22] João Peças Lopes,et al. Probabilistic evaluation of reserve requirements of generating systems with renewable power sources: The Portuguese and Spanish cases , 2009 .
[23] J. Hammersley. SIMULATION AND THE MONTE CARLO METHOD , 1982 .
[24] Wenyuan Li,et al. Extracting rare failure events in composite system reliability evaluation via subset simulation , 2015, 2015 IEEE Power & Energy Society General Meeting.
[25] Roy Billinton,et al. Operating reserve assessment in interconnected generating systems , 1988 .
[26] R. Billinton,et al. Long-Term Probabilistic Evaluation of Operating Reserve Requirements With Renewable Sources , 2010, IEEE Transactions on Power Systems.