Operationalizing lean principles for lead time reduction in engineer-to-order (ETO) operations: A case study

Abstract The engineer-to-order (ETO) manufacturing approach is used in companies developing and producing highly customized products. ETO operations include some characteristic business processes such as the sales and tendering process, engineering and design and project management. The characteristics of the ETO environment creates high complexity in these processes, resulting in considerable amounts of waste. The potential for lead time reduction is therefore high also in these processes, not only in the production and assembly processes. Building on lean manufacturing this paper seeks to operationalize lean principles in ETO operations. Through an in-depth case study of an ETO company this paper investigates the challenges, problems and improvement opportunities in the business processes of an ETO company by applying an adapted value stream mapping (VSM) approach. The study served to identify main sources of waste which negatively affect lead time in ETO operations. The paper further presents specific guidelines that operationalizes lean principles in order to reduce waste and improve lead time in ETO operations.

[1]  Marcello Braglia,et al.  A new value stream mapping approach for complex production systems , 2006 .

[2]  Erlend Alfnes,et al.  A New Value Stream Mapping Approach for Engineer-to-Order Production Systems , 2015, APMS.

[3]  R. Lester,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 2008 .

[4]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[5]  Christopher Earl,et al.  Modelling supply chain management processes in engineer-to-order companies , 1999 .

[6]  Erlend Alfnes,et al.  Mass Customization Challenges of Engineer-to-Order Manufacturing , 2017 .

[7]  Jan Olhager,et al.  Strategic positioning of the order penetration point , 2003 .

[8]  Jan Ola Strandhagen,et al.  Strategies for customized shipbuilding with different customer order decoupling points , 2014 .

[9]  Joseph C. Chen,et al.  Value Stream Management for Lean Office—A Case Study , 2012 .

[10]  Iris D. Tommelein,et al.  A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-order Manufacturers , 2014 .

[11]  Tomaso Poggio,et al.  Learning to see , 1996 .

[12]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[13]  Nitin Seth,et al.  Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: a case study , 2017 .

[14]  D. T. Matt,et al.  Adaptation of the value stream mapping approach to the design of lean engineer-to-order production systems: A case study , 2014 .

[15]  A. Posner Learning to see. , 1955, Eye, ear, nose & throat monthly.

[16]  Marco Taisch,et al.  Motivations and Challenges for Engineer-to-Order Companies Moving toward Mass Customization , 2014, APMS.

[17]  Jan Ola Strandhagen,et al.  Analyzing the factors affecting coordination in engineer-to-order supply chain , 2015 .

[18]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .