Day-ahead corrective transmission topology control
暂无分享,去创建一个
[1] Tsung-Ying Lee. Optimal Spinning Reserve for a Wind-Thermal Power System Using EIPSO , 2007, IEEE Transactions on Power Systems.
[2] R.P. O'Neill,et al. Optimal Transmission Switching With Contingency Analysis , 2010, IEEE Transactions on Power Systems.
[3] Kory W. Hedman,et al. Topology Control for Load Shed Recovery , 2014, IEEE Transactions on Power Systems.
[4] J.N. Wrubel,et al. Practical experience with corrective switching algorithm for on-line applications , 1995, Proceedings of Power Industry Computer Applications Conference.
[5] Daniel S. Kirschen,et al. Optimizing the spinning reserve requirements using a cost/benefit analysis , 2008, PES 2008.
[6] F. Bouffard,et al. Stochastic security for operations planning with significant wind power generation , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
[7] Philip G. Hill,et al. Power generation , 1927, Journal of the A.I.E.E..
[8] François Bouffard,et al. Scheduling and Pricing of Coupled Energy and Primary, Secondary, and Tertiary Reserves , 2005, Proceedings of the IEEE.
[9] Kory W. Hedman,et al. Robust Corrective Topology Control for System Reliability , 2013, IEEE Transactions on Power Systems.
[10] Tongxin Zheng,et al. Contingency-Based Zonal Reserve Modeling and Pricing in a Co-Optimized Energy and Reserve Market , 2008, IEEE Transactions on Power Systems.
[11] A. Cha,et al. Fast Heuristics for Transmission-Line Switching , 2012, IEEE Transactions on Power Systems.
[12] S. Oren,et al. Optimal Transmission Switching—Sensitivity Analysis and Extensions , 2008, IEEE Transactions on Power Systems.
[13] Li Wang,et al. Combining the Wind Power Generation System With Energy Storage Equipment , 2009, IEEE Transactions on Industry Applications.
[14] M. O'Malley,et al. A new approach to quantify reserve demand in systems with significant installed wind capacity , 2005, IEEE Transactions on Power Systems.
[15] Chung-Liang Chang,et al. Combining the Wind Power Generation System with Energy Storage Equipments , 2008, 2008 IEEE Industry Applications Society Annual Meeting.
[16] Kory W. Hedman,et al. A review of transmission switching and network topology optimization , 2011, 2011 IEEE Power and Energy Society General Meeting.
[17] Michael Ferris,et al. Co-optimization of generation unit commitment and transmission switching with N-1 reliability , 2010, IEEE PES General Meeting.
[18] J. G. Rolim,et al. A study of the use of corrective switching in transmission systems , 1999 .
[19] Kory W. Hedman,et al. Analyzing the impacts of out-of-market corrections , 2013, 2013 IREP Symposium Bulk Power System Dynamics and Control - IX Optimization, Security and Control of the Emerging Power Grid.
[20] A. Conejo,et al. Economic Valuation of Reserves in Power Systems With High Penetration of Wind Power , 2009 .
[21] M. Ferris,et al. Optimal Transmission Switching , 2008, IEEE Transactions on Power Systems.
[22] José Fernando Prada. The Value of Reliability in Power Systems-Pricing Operating Reserves-June 1999 , 1999 .