An integrated approach to reactive scheduling subject to machine breakdown
暂无分享,去创建一个
J.Y.H. Fuh | Y.F. Zhang | Y.F. Wang | Z.D. Zhou | P. Lou | L.G. Xue | J. Fuh | P. Lou | Y.F. Zhang | Y.F. Wang | Z.D. Zhou | L. Xue
[1] Andrew Y. C. Nee,et al. A simulated annealing-based optimization algorithm for process planning , 2000 .
[2] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[3] Kazuo Miyashita,et al. Case-based knowledge acquisition for schedule optimization , 1995, Artif. Intell. Eng..
[4] Richard Y. K. Fung,et al. An agent-based negotiation approach to integrate process planning and scheduling , 2006 .
[5] Jerry Y. H. Fuh,et al. Integration of process planning and scheduling by exploring the flexibility of process planning , 2003 .
[6] Jesuk Ko,et al. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling , 2003, Comput. Oper. Res..
[7] Jun Ota,et al. A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability , 2006, 2006 IEEE International Conference on Automation Science and Engineering.
[8] Manolis A. Christodoulou,et al. Application of a neural-network scheduler on a real manufacturing system , 2001, IEEE Trans. Control. Syst. Technol..
[9] Jean-Pierre Kruth,et al. A collaborative process planning and scheduling system , 1994 .
[10] Behrokh Khoshnevis,et al. Integration of process planning and scheduling— a review , 2000, J. Intell. Manuf..
[11] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[12] Weiming Shen,et al. Agent-based distributed manufacturing process planning and scheduling: a state-of-the-art survey , 2006, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).
[13] J. A. Svestka,et al. Rescheduling job shops under random disruptions , 1997 .
[14] H.J.J. Kals,et al. The integration of process planning and shop floor scheduling in small batch part manufacturing , 1995 .
[15] Amritpal Singh Raheja,et al. Reactive repair tool for job shop schedules , 2005 .
[16] Rong-Kwei Li,et al. A heuristic rescheduling algorithm for computer-based production scheduling systems , 1993 .
[17] Mark Wallace,et al. Probe Backtrack Search for Minimal Perturbation in Dynamic Scheduling , 2000, Constraints.
[18] C. Saygin,et al. Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems , 1999 .