Lessons Learned in Applying Domain-Independent Planning to High-Speed Manufacturing
暂无分享,去创建一个
[1] Wheeler Ruml,et al. On-line Planning and Scheduling for High-speed Manufacturing , 2005, ICAPS.
[2] Rina Dechter,et al. Temporal Constraint Networks , 1989, Artif. Intell..
[3] David E. Smith,et al. Temporal Planning with Mutual Exclusion Reasoning , 1999, IJCAI.
[4] Malik Ghallab,et al. Representation and Control in IxTeT, a Temporal Planner , 1994, AIPS.
[5] Hector Geffner,et al. Heuristic Planning with Time and Resources , 2014 .
[6] Nicola Muscettola,et al. HSTS: Integrating Planning and Scheduling , 1993 .
[7] Daniel G. Bobrow,et al. Model-Based Computing: Developing Flexible Machine Control Software , 1999, Artif. Intell..
[8] J. Christopher Beck,et al. Scheduling Alternative Activities , 1999, AAAI/IAAI.
[9] Ari K. Jónsson,et al. Activity Planning for the Mars Exploration Rovers , 2005, ICAPS.