Negative results for scheduling independent hard real-time tasks with self-suspensions
暂无分享,去创建一个
[1] Pascal Richard,et al. On the complexity of scheduling real-time tasks with self-suspensions on one processor , 2003, 15th Euromicro Conference on Real-Time Systems, 2003. Proceedings..
[2] Kyung-Hee Choi,et al. Real-time scheduling of tasks that contain the external blocking intervals , 1995, Proceedings Second International Workshop on Real-Time Computing Systems and Applications.
[3] UmaMaheswari Devi,et al. An improved schedulability test for uniprocessor periodic task systems , 2003, 15th Euromicro Conference on Real-Time Systems, 2003. Proceedings..
[4] Chung Laung Liu,et al. Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment , 1989, JACM.
[5] Charles U. Martel,et al. On non-preemptive scheduling of period and sporadic tasks , 1991, [1991] Proceedings Twelfth Real-Time Systems Symposium.
[6] Cynthia A. Phillips,et al. Optimal Time-Critical Scheduling via Resource Augmentation , 1997, STOC '97.
[7] Aloysius Ka-Lau Mok,et al. Fundamental design problems of distributed systems for the hard-real-time environment , 1983 .
[8] Michael González Harbour,et al. Response time analysis of EDF distributed real-time systems , 2005, J. Embed. Comput..
[9] James W. Layland,et al. Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment , 1989, JACM.
[10] Sanjoy K. Baruah,et al. On-line scheduling to maximize task completions , 1994, 1994 Proceedings Real-Time Systems Symposium.
[11] Michael González Harbour,et al. Schedulability analysis for tasks with static and dynamic offsets , 1998, Proceedings 19th IEEE Real-Time Systems Symposium (Cat. No.98CB36279).