Joint optimization of flowshop sequence-dependent manufacturing cell scheduling and preventive maintenance

Considering the effects of machine breakdown and preventative maintenance (PM)on production scheduling in flowshop manufacturing cells, this paper focuses on investigating the joint optimization problem of flowshop sequence-dependent manufacturing cell scheduling and PM. A joint model is proposed and it aims to find the optimal production sequence of job families and individual jobs within each family and the optimal PM decisions before each job such that the sum of tardiness cost of jobs, PM and minimal repair cost of machines is minimized. A genetic algorithm-based approach is developed to solve the joint problem. Elitism strategy and local search are applied. The numerical results reveal the potential benefits of the consideration of PM and the integration of production scheduling and PM. Further experiments show elitism strategy and local search are important for improving the performance of the proposed approach.

[1]  Dipak Chaudhuri,et al.  Sequential imperfect preventive maintenance policies: A case study , 1992 .

[2]  Pablo Moscato,et al.  Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups , 2005, Comput. Ind. Eng..

[3]  Yazhi Li,et al.  Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search , 2015, Expert Syst. Appl..

[4]  Shih-Wei Lin,et al.  Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times , 2009, Comput. Oper. Res..

[5]  Ming Liu,et al.  Two-machine flow shop scheduling integrated with preventive maintenance planning , 2016, Int. J. Syst. Sci..

[6]  Peigen Li,et al.  An effective hybrid genetic algorithm for the job shop scheduling problem , 2008 .

[7]  Jatinder N. D. Gupta,et al.  A comprehensive review of flowshop group scheduling literature , 2016, Comput. Oper. Res..

[8]  Chen Li,et al.  A hybrid genetic algorithm for non-permutation flow shop scheduling problems with unavailability constraints , 2016, Int. J. Comput. Integr. Manuf..

[9]  Nancy Lea Hyer,et al.  Cellular manufacturing in the U.S. industry: a survey of users , 1989 .

[10]  Mazhar Ali Khan Malik,et al.  Reliable Preventive Maintenance Scheduling , 1979 .

[11]  Mitsuo Gen,et al.  Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm , 2006, J. Intell. Manuf..

[12]  Jatinder N. D. Gupta,et al.  Scheduling a flowline manufacturing cell with sequence dependent family setup times , 2000, Eur. J. Oper. Res..