The concrete delivery problem
暂无分享,去创建一个
Greet Vanden Berghe | Tony Wauters | Joris Kinable | T. Wauters | G. V. Berghe | J. Kinable | Joris Kinable
[1] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[2] M. Surico,et al. Concrete Delivery using a combination of GA and ACO , 2005, Proceedings of the 44th IEEE Conference on Decision and Control.
[3] J. Desrosiers,et al. A Primer in Column Generation , 2005 .
[4] Siwate Rojanasoonthon,et al. A branch‐and‐price algorithm for parallel machine scheduling with time windows and job priorities , 2006 .
[5] Simon Smith,et al. Modeling the ready mixed concrete delivery system with neural networks , 2006 .
[6] Shangyao Yan,et al. An optimal scheduling model for ready mixed concrete supply with overtime considerations , 2007 .
[7] Uzay Kaymak,et al. Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete , 2007, Eur. J. Oper. Res..
[8] Philippe Laborie,et al. Reasoning with Conditional Time-Intervals , 2008, FLAIRS.
[9] Petr Vilím,et al. Reasoning with Conditional Time-Intervals. Part II: An Algebraical Model for Resources , 2009, FLAIRS.
[10] Erwin Pesch,et al. Analysis, modeling and solution of the concrete delivery problem , 2009, Eur. J. Oper. Res..
[11] Martin W. P. Savelsbergh,et al. A Hybrid Solution Approach for Ready-Mixed Concrete Delivery , 2009, Transp. Sci..
[12] Jenhung Wang,et al. Dispatching ready mixed concrete trucks under demand postponement and weight limit regulation , 2010 .
[13] Juan José Salazar González,et al. Hybridization of very large neighborhood search for ready-mixed concrete delivery problems , 2010, Comput. Oper. Res..
[14] Alain Hertz,et al. Integer linear programming models for a cement delivery problem , 2012, Eur. J. Oper. Res..
[15] Frits C. R. Spieksma,et al. Optimal solutions for a dock assignment problem with trailer transportation , 2010, Annals of Operations Research.