A collaborative manufacturing execution platform for space product development

Space product development enterprise has the feature of single piece or small batch productions, in which the product manufacturing process changes frequently, key components need process preparation, and production scheduling problem is often complicated. According to the development process of space products, a collaborative platform under network-based manufacturing environment for space products development is proposed in this paper. The main structure of the platform and the cooperation process between each application modules are proposed. Moreover, a kind of dynamic job shop scheduling algorithm is presented. The algorithm is used to realize rapid response and adjust manufacturing plan when production or process plan has changed. Finally, a prototype system that supports space product manufacturing process management is developed and a case study is presented to demonstrate the efficiency of proposed algorithm.

[1]  A hybrid model using genetic algorithm and neural network for process parameters optimization in NC camshaft grinding , 2009 .

[2]  Hans-Jürgen Appelrath,et al.  Multi-site scheduling with fuzzy concepts , 1998, Int. J. Approx. Reason..

[3]  Young-Hwan Choi,et al.  Component-based modeling of enterprise architectures for collaborative manufacturing , 2007 .

[4]  Pierre Borne,et al.  Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems , 2002, IEEE Trans. Syst. Man Cybern. Part C.

[5]  Huizhuo Shi,et al.  Optimization of injection molding process parameters using integrated artificial neural network model and expected improvement function method , 2010 .

[6]  Velusamy Subramaniam,et al.  Reactive Recovery of Job Shop Schedules – A Review , 2002 .

[7]  Steven J. Fenves,et al.  A product information modeling framework for product lifecycle management , 2005, Comput. Aided Des..

[8]  Rassoul Noorossana,et al.  A neural network-based control scheme for monitoring start-up processes and short runs , 2010 .

[9]  Chi Fai Cheung,et al.  A web-based collaborative product design platform for dispersed network manufacturing , 2003 .

[10]  X. Shao,et al.  A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem , 2010 .

[11]  Pierre Borne,et al.  Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic , 2002, Math. Comput. Simul..

[12]  Joe Cecil,et al.  A distributed internet-based framework for manufacturing planning , 2006 .

[13]  Ali Azadeh,et al.  A flexible artificial neural network–fuzzy simulation algorithm for scheduling a flow shop with multiple processors , 2010 .

[14]  Pierre Borne,et al.  Correction to "approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems" , 2002, IEEE Trans. Syst. Man Cybern. Part C.

[15]  Sun Hur,et al.  Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain , 2002 .

[16]  Wan Li,et al.  Internet-based collaborative product development chain for networked product development , 2006 .

[17]  Ajith Abraham,et al.  Variable Neighborhood Particle Swarm Optimization for Multi-objective Flexible Job-Shop Scheduling Problems , 2006, SEAL.

[18]  Gaoliang Peng,et al.  Research on ontology-based integration of product knowledge for collaborative manufacturing , 2010 .

[19]  Gerd Finke,et al.  An Integrated Model for an Industrial Production–Distribution Problem , 2001 .

[20]  M. Zandieh,et al.  An efficient architecture for scheduling flexible job-shop with machine availability constraints , 2010 .

[21]  Mingyuan Chen,et al.  A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setups , 2010 .

[22]  Zhiming Wu,et al.  An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems , 2005, Comput. Ind. Eng..

[23]  Saeed Mansour,et al.  Dynamic flexible job shop scheduling with alternative process plans: an agent-based approach , 2011 .

[24]  Godfrey C. Onwubolu,et al.  Three tiered web-based manufacturing system-Part 1: System development , 2007 .

[25]  Carlo Vercellis,et al.  Multi-plant production planning in capacitated self-configuring two-stage serial systems , 1999, Eur. J. Oper. Res..

[26]  Hong-Chao Zhang,et al.  Computerized Manufacturing Process Planning Systems , 1994 .

[27]  Wai Keung Wong,et al.  Genetic optimization of order scheduling with multiple uncertainties , 2008, Expert Syst. Appl..

[28]  George-Christopher Vosniakos,et al.  Neural network simulation metamodels and genetic algorithms in analysis and design of manufacturing cells , 2006 .