Critical risk factors in the application of modular integrated construction: a systematic review

The business model of modular integrated construction (MiC) demands a unique design, engineering, supply chain, stakeholder composition, construction and management. These requirements engender man...

[1]  Chao Mao,et al.  A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation , 2018 .

[2]  Elisa D. Sotelino,et al.  Interactions of Building Information Modeling, Lean and Sustainability on the Architectural, Engineering and Construction industry: A systematic review , 2018 .

[3]  Charles J. Kibert,et al.  The next generation of sustainable construction , 2007 .

[4]  Nashwan Dawood Scheduling in the precast concrete industry using the simulation modelling approach , 1995 .

[5]  Panagiotis Angeloudis,et al.  Optimal logistics planning for modular construction using multi-stage stochastic programming , 2018, Transportation Research Procedia.

[6]  Geoffrey Qiping Shen,et al.  Critical review of the research on the management of prefabricated construction , 2014 .

[7]  C S Poon,et al.  Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. , 2009, Waste management.

[8]  Ming Li,et al.  Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model , 2017 .

[9]  Chris I. Goodier,et al.  House-Building Business Models and Off-Site Construction Take-Up , 2012 .

[10]  E. Chan,et al.  Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong , 2006 .

[11]  Maury A. Nussbaum,et al.  Low back injury risks during construction with prefabricated (panelised) walls: effects of task and design factors , 2011, Ergonomics.

[12]  Salihudin Hassim,et al.  The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia , 2009 .

[13]  M. Motiar Rahman,et al.  Barriers of Implementing Modern Methods of Construction , 2014 .

[14]  A. Chan,et al.  Review of studies on the Critical Success Factors for Public–Private Partnership (PPP) projects from 1990 to 2013 , 2015 .

[15]  Manikam Pillay,et al.  Developing a safety climate factor model in construction research and practice , 2018, Engineering, Construction and Architectural Management.

[16]  Alistair G.F. Gibb,et al.  Management of Prefabrication for Complex Cladding: Case Study , 1997 .

[17]  Stephen O. Ogunlana,et al.  Best practice of prefabrication implementation in the Hong Kong public and private sectors , 2015 .

[18]  Joy Don Baker,et al.  The Purpose, Process, and Methods of Writing a Literature Review. , 2016, AORN journal.

[19]  Yanhu Han,et al.  IDENTIFYING BARRIERS TO OFF-SITE CONSTRUCTION USING GREY DEMATEL APPROACH: CASE OF CHINA , 2018, Journal of Civil Engineering and Management.

[20]  B. Hwang,et al.  Key constraints and mitigation strategies for prefabricated prefinished volumetric construction , 2018 .

[21]  L. Koskela Is structural change the primary solution to the problems of construction? , 2003 .

[22]  Mohamed Al-Hussein,et al.  Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation , 2013 .

[23]  Roger-Bruno Richard,et al.  Industrialised building systems: reproduction before automation and robotics , 2005 .

[24]  Wei Pan,et al.  Demystifying the cost barriers to offsite construction in the UK , 2011 .

[25]  Alistair G.F. Gibb,et al.  Standardization and pre-assembly- distinguishing myth from reality using case study research , 2001 .

[26]  Yea-Sang Kim,et al.  Analysis of cost-increasing risk factors in modular construction in Korea using FMEA , 2017 .

[27]  Vivian W. Y Tam,et al.  Towards adoption of prefabrication in construction , 2007 .

[28]  Ruoyu Jin,et al.  Perceptions towards risks involved in off-site construction in the integrated design & construction project delivery , 2019, Journal of Cleaner Production.

[29]  Carl T. Haas,et al.  Managing risk in modular construction using dimensional and geometric tolerance strategies , 2017 .

[30]  Wei Zhang,et al.  The hindrance to using prefabrication in Hong Kong's building industry , 2018, Journal of Cleaner Production.

[31]  M. Moro,et al.  Metasynthesis: An Original Method to Synthesize Qualitative Literature in Psychiatry , 2017, Front. Psychiatry.

[32]  Geoffrey Qiping Shen,et al.  Schedule risk modeling in prefabrication housing production , 2017 .

[33]  Geoffrey Qiping Shen,et al.  Barriers to promoting prefabricated construction in China : a cost-benefit analysis , 2018 .

[34]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[35]  M. Arif,et al.  Making a case for offsite construction in China , 2010 .

[36]  Sunwook Kim,et al.  The benefits of an additional worker are task-dependent: assessing low-back injury risks during prefabricated (panelized) wall construction. , 2012, Applied ergonomics.

[37]  E. Zavadskas,et al.  Critical evaluation of off-site construction research: a scientometric analysis , 2018 .

[38]  Jyh-Bin Yang,et al.  Causes of Delay in the Planning and Design Phases for Construction Projects , 2010 .

[39]  Alistair G.F. Gibb,et al.  Benefit evaluation for off‐site production in construction , 2006 .

[40]  R. Reed,et al.  Factors impeding the offsite production of housing construction in China: an investigation of current practice , 2014 .

[41]  Mohamed Al-Hussein,et al.  Carbon Reduction Measures-Based LCA of Prefabricated Temporary Housing with Renewable Energy Systems , 2018 .

[42]  G. Shen,et al.  Stakeholder management studies in mega construction projects: A review and future directions , 2015 .

[43]  Gul Polat,et al.  Factors Affecting the Use of Precast Concrete Systems in the United States , 2008 .

[44]  Jian Zuo,et al.  Barriers to the transition towards off-site construction in China: An Interpretive structural modeling approach , 2018, Journal of Cleaner Production.

[45]  Hao Hu,et al.  Simulation based multiple disturbances evaluation in the precast supply chain for improved disturbance prevention , 2018 .

[46]  Rafaela Bortolini,et al.  Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling , 2019, Automation in Construction.

[47]  Graham Winch,et al.  Zephyrs of creative destruction: understanding the management of innovation in construction , 1998 .

[48]  O. Edenhofer,et al.  Mitigation from a cross-sectoral perspective , 2007 .

[49]  John D. Quale,et al.  Construction Matters: Comparing Environmental Impacts of Building Modular and Conventional Homes in the United States , 2012 .

[50]  Nashwan Dawood An integrated bidding management expert system for the make-to-order precast industry , 1995 .

[51]  E. Sarah Slaughter,et al.  Models of Construction Innovation , 1998 .

[52]  Ruidong Chang,et al.  Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis , 2018, Journal of Cleaner Production.

[53]  Qiping Shen,et al.  Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects , 2013 .

[54]  Deborah Finfgeld-Connett,et al.  Use of content analysis to conduct knowledge-building and theory-generating qualitative systematic reviews , 2014 .

[55]  Wei Pan,et al.  Major Barriers to Off-Site Construction: The Developer’s Perspective in China , 2015 .

[56]  Ray Y. Zhong,et al.  Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction , 2017 .

[57]  Margaret K.Y. Mok,et al.  Schedule risks in prefabrication housing production in Hong Kong: a social network analysis , 2016 .

[58]  Geoffrey Qiping Shen,et al.  Schedule delay analysis of prefabricated housing production: A hybrid dynamic approach , 2017 .

[59]  Yi Peng,et al.  Exploring the challenges to industrialized residential building in China , 2014 .

[60]  Geoffrey Qiping Shen,et al.  A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong , 2018, Journal of Cleaner Production.

[61]  S. Perera,et al.  Barriers to public private partnership projects in developing countries: A case of Nigeria , 2015 .

[62]  Yuejin Tan,et al.  Sustainable Queuing-Network Design for Airport Security Based on the Monte Carlo Method , 2018 .

[63]  Ron Wakefield,et al.  Drivers, constraints and the future of offsite manufacture in Australia , 2007 .

[64]  Hao Hu,et al.  Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components , 2018 .