An improved coordinated control technology for coal-fired boiler-turbine plant based on flexible steam extraction system

Abstract Coordinated control system (CCS) used in thermal power unit can quickly coordinate energy balance between the plant boiler and steam turbine, and follow the load commands. The development of renewable energy, however, has increased the load change rate and amplitude requirements for thermal power units. This implies that the difficulties associated with ensuring plant parameters stable and rapid tracking of load commands has augmented as well. In order to improve the peaking rate and amplitude of thermal power units, based on energy and mass balance principles, a dynamic mathematical model of a thermal power unit including steam turbine regenerative systems is developed. The developed model is verified by comparing the results obtained from the model with the corresponding ones coming from field tests. Moreover, an improved coordinated control technology based on flexible steam extraction system is proposed, the flexible steam extraction system is achieved by installing throttle valve in the steam turbine extraction line. Finally, load command step and ramp up simulation tests are carried out under the improved CCS.

[1]  Chandrasekharan Sreepradha,et al.  Mathematical model for integrated coal fired thermal boiler using physical laws , 2017 .

[2]  Tian Liang Analysis on Multi-scale Correlation of Thermal Signal Based on Wavelet Transform , 2010 .

[3]  Xiaobing Kong,et al.  Nonlinear multivariable hierarchical model predictive control for boiler-turbine system , 2015 .

[4]  Danijel Pavković,et al.  Dynamic model of a natural water circulation boiler suitable for on-line monitoring of fossil/alternative fuel plants , 2014 .

[5]  Mohsen Assadi,et al.  Development of artificial neural network model for a coal-fired boiler using real plant data , 2009 .

[6]  Rathinasamy Sakthivel,et al.  New results on passivity-based H∞ control for networked cascade control systems with application to power plant boiler–turbine system , 2015 .

[7]  Ben Wang,et al.  A dynamic mathematical model of an ultra-supercritical coal fired once-through boiler-turbine unit , 2017 .

[8]  F. J. Gutiérrez Ortiz Modeling of fire-tube boilers , 2011 .

[9]  Liu Xinpin A Control Method of Rapid Load Change for Heat Supply Units Compensating Wind Power Disturbance , 2014 .

[10]  Tao Yu,et al.  Coordinated robust nonlinear boiler-turbine-generator control systems via approximate dynamic feedback linearization , 2010 .

[11]  Ali Ghaffari,et al.  A simulated model for a once-through boiler by parameter adjustment based on genetic algorithms , 2007, Simul. Model. Pract. Theory.

[12]  Yu Li,et al.  A non-equal fragment model of a water-wall in a supercritical boiler , 2015 .

[13]  Aaron Hussey,et al.  Simultaneous gains tuning in boiler/turbine PID-based controller clusters using iterative feedback tuning methodology. , 2012, ISA transactions.

[14]  Yali Xue,et al.  Control-oriented modeling and analysis of direct energy balance in coal-fired boiler-turbine unit , 2016 .

[15]  Ali Ghaffari,et al.  Steam turbine model , 2008, Simul. Model. Pract. Theory.

[16]  Jizhen Liu,et al.  Modeling for condensate throttling and its application on the flexible load control of power plants , 2016 .

[17]  Jizhen Liu,et al.  An improved coordinated control strategy for boiler-turbine units supplemented by cold source flow adjustment , 2015 .

[18]  Le Wei,et al.  Backstepping-based nonlinear adaptive control for coal-fired utility boiler–turbine units , 2011 .

[19]  Xiao Wu,et al.  Hierarchical optimization of boiler–turbine unit using fuzzy stable model predictive control , 2014 .

[20]  Martin Schmitz,et al.  Development and validation of a dynamic simulation model for a large coal-fired power plant , 2015 .

[21]  Zhu Zelei Mathematical Model of Coordinated Control Object for Drum-boiler Turbine Generator Unit Considering Regenerator System , 2009 .

[22]  Jizhen Liu,et al.  Improved boiler-turbine coordinated control of 1000 MW power units by introducing condensate throttling , 2017 .

[23]  J Wu,et al.  Robust H(infinity) tracking control of boiler-turbine systems. , 2010, ISA transactions.

[24]  Jiong Shen,et al.  Offset-free fuzzy model predictive control of a boiler-turbine system based on genetic algorithm , 2012, Simul. Model. Pract. Theory.

[25]  N. Anantharaman,et al.  Artificial Neural Networks model for predicting wall temperature of supercritical boilers , 2015 .

[26]  Jiong Shen,et al.  L1 adaptive control for improving load-following capability of nonlinear boiler-turbine units in the presence of unknown uncertainties , 2015, Simul. Model. Pract. Theory.

[27]  Michal Kvasnica,et al.  Control of a boiler-turbine unit using MPC-based reference governors , 2017 .

[28]  Yaguo Lei,et al.  A review on empirical mode decomposition in fault diagnosis of rotating machinery , 2013 .

[29]  Aria Alasty,et al.  Nonlinear dynamics and control of bifurcation to regulate the performance of a boiler–turbine unit , 2013 .

[30]  Jizhen Liu,et al.  A dynamic model used for controller design of a coal fired once-through boiler-turbine unit , 2015 .