Managing and reducing total cycle time: models and analysis
暂无分享,去创建一个
[1] Taiichi Ohno,et al. Toyota Production System : Beyond Large-Scale Production , 1988 .
[2] E. A. Hall,et al. How to Make Reengineering Really Work , 1994 .
[3] R. Schonberger. Japanese Manufacturing Techniques , 1982 .
[4] M. Hammer,et al. Reengineering the Corporation , 1993 .
[5] W. Whitt,et al. The Queueing Network Analyzer , 1983, The Bell System Technical Journal.
[6] John Miltenburg,et al. Designing and phasing in just-in-time production systems , 1991 .
[7] Manjunath Kamath,et al. Chapter 5 Performance evaluation of production networks , 1993, Logistics of Production and Inventory.
[8] Sdp Simme Douwe Flapper,et al. Embedding JIT into MRP , 1991 .
[9] John G. Kemeny,et al. Finite Markov chains , 1960 .
[10] G. Stalk. Time-The Next Source of Competitive Advantage , 1988 .
[11] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[12] Carl M. Harris,et al. Fundamentals of queueing theory , 1975 .
[13] John B. Kidd,et al. Toyota Production System , 1993 .
[14] Eric R. Zieyel. Operations research : applications and algorithms , 1988 .
[15] Daniel Roos,et al. The machine that changed the world : the story of lean production , 1991 .