Fuzzy Random MOMSDM for Transportation Assignment
暂无分享,去创建一个
In large scale hydropower construction projects, the transportation system is crucial and because of the massive cost and construction duration, this comprehensive optimization allocation transportation problem must be dealt with urgently, especially when there is a complex uncertain environment. Therefore this chapter focuses on a multi-objective optimization for a two-stage based earth and rockfill dam construction transportation system under a fuzzy random environment with the aim of minimizing total operational costs, transportation duration and total waste.