Simultaneous resource portfolio planning under demand and technology uncertainty in the semiconductor testing industry
暂无分享,去创建一个
[1] Sancho Salcedo-Sanz,et al. A survey of repair methods used as constraint handling techniques in evolutionary algorithms , 2009, Comput. Sci. Rev..
[2] Marc Goetschalckx,et al. A stochastic programming approach for supply chain network design under uncertainty , 2004, Eur. J. Oper. Res..
[3] Manuel Mateo,et al. Planning production using mathematical programming: The case of a woodturning company , 2009, Comput. Oper. Res..
[4] Yi-Feng Hung,et al. A new formulation technique for alternative material planning—an approach for semiconductor bin allocation planning , 1997 .
[5] Stefano Giordani,et al. A fast metaheuristic for scheduling independent tasks with multiple modes , 2009, Comput. Ind. Eng..
[6] Chen-Fu Chien,et al. A fuzzy-knowledge resource-allocation model of the semiconductor final test industry , 2009 .
[7] T. Bashyam,et al. Competitive capacity expansion under demand uncertainty , 1996 .
[8] Mitsuo Gen,et al. Genetic algorithms and engineering optimization , 1999 .
[9] Lola Esteban,et al. Strategic Targeted Advertising and Market Fragmentation , 2007 .
[10] Andrii Gritsevskyi,et al. Modeling uncertainty of induced technological change , 2000 .
[11] Manoj Kumar Tiwari,et al. Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm , 2006, Eur. J. Oper. Res..
[12] Jang Hee Lee,et al. Artificial intelligence-based sampling planning system for dynamic manufacturing process , 2002, Expert Syst. Appl..
[13] Kathrin Klamroth,et al. Decision Aiding An MCDM approach to portfolio optimization , 2004 .
[14] Randy L. Haupt,et al. Practical Genetic Algorithms , 1998 .
[15] Manoj Kumar Tiwari,et al. Modelling the slab stack shuffling problem in developing steel rolling schedules and its solution using improved Parallel Genetic Algorithms , 2004 .
[16] Neslihan Aydogan,et al. Notes on the Merger Strategy of High versus Low-tech Industries: Complementarities and Moral Hazard , 2002 .
[17] Kung-Jeng Wang,et al. Capacity expansion and allocation for a semiconductor testing facility under constrained budget , 2002 .
[18] Yazid M. Sharaiha,et al. Heuristics for cardinality constrained portfolio optimisation , 2000, Comput. Oper. Res..
[19] M.-J. Chen,et al. Cooperative capacity planning and resource allocation by mutual outsourcing using ant algorithm in a decentralized supply chain , 2009, Expert Syst. Appl..
[20] J. D. Sherman,et al. Environmental uncertainty, organizational integration, and new product development effectiveness: a test of contingency theory - A contingency analysis , 1998 .
[21] Mehmet Barut,et al. Design and evaluation of a dynamic capacity apportionment procedure , 2004, Eur. J. Oper. Res..
[22] Jonathan F. Bard,et al. AN OPTIMIZATION APPROACH TO CAPACITY EXPANSION IN SEMICONDUCTOR MANUFACTURING FACILITIES , 1999 .
[23] Kathrin Klamroth,et al. An MCDM approach to portfolio optimization , 2004, Eur. J. Oper. Res..
[24] Tsung-Rian Chen,et al. Job shop scheduling with multiple resources and an application to a semiconductor testing facility , 1994, Proceedings of 1994 33rd IEEE Conference on Decision and Control.
[25] Andrew Higgins,et al. A simulation model for capacity planning in sugarcane transport , 2005 .
[26] Philippe Fortemps,et al. A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[27] Shu-Cherng Fang,et al. A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing , 2009 .
[28] Kuo-Hwa Chang,et al. A STOCHASTIC PROGRAMMING MODEL FOR PORTFOLIO SELECTION , 2002 .
[29] S.-M. Wang,et al. A resource portfolio model for equipment investment and allocation of semiconductor testing industry , 2007, Eur. J. Oper. Res..
[30] S. Rajagopalan,et al. Capacity expansion with alternative technology choices , 1994 .
[31] Reha Uzsoy,et al. Production scheduling algorithms for a semiconductor test facility , 1991 .
[32] R. C. Leachman,et al. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations , 1996 .
[33] Alexander Shapiro,et al. A simulation-based approach to two-stage stochastic programming with recourse , 1998, Math. Program..
[34] J I Hsu. Equipment replacement policy: a survey. , 1990, Hospital materiel management quarterly.
[35] Laureano F. Escudero,et al. A stochastic 0-1 program based approach for the air traffic flow management problem , 2000, Eur. J. Oper. Res..
[36] Shouyang Wang,et al. A compromise solution to mutual funds portfolio selection with transaction costs , 2001, Eur. J. Oper. Res..
[37] Selin Özpeynirci,et al. A note on "A mixed integer programming model for advanced planning and scheduling (APS)" , 2010, Eur. J. Oper. Res..
[38] Jayashankar M. Swaminathan. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty , 2000, Eur. J. Oper. Res..