Simultaneous resource portfolio planning under demand and technology uncertainty in the semiconductor testing industry

Abstract One of the most challenging issues for the semiconductor testing industry is how to deal with capacity planning and resource allocation simultaneously under demand and technology uncertainty. In addition, capacity planners require a tradeoff among the costs of resources with different processing technologies, while simultaneously considering resources to manufacture products. The need for exploring better solutions further increases the complexity of the problem. This study focuses on the decisions pertaining to (i) the simultaneous resource portfolio/investment and allocation plan accounting for the hedging tradeoff between the expected profit and risk, (ii) the most profitable orders from pending ones in each time bucket under demand and technology uncertainty, (iii) the algorithm to efficiently solve the stochastic and mixed integer programming problem. Due to the high computational complexity of the problem, this study develops a constraint-satisfaction based genetic algorithm, in conjunction with a chromosome-repair mechanism and sampling procedure, to resolve the above issues simultaneously. The experimental results indicate that the proposed mathematical model can accurately represent the resource portfolio planning problem of the semiconductor testing industry, and the solution algorithm can solve the problem efficiently.

[1]  Sancho Salcedo-Sanz,et al.  A survey of repair methods used as constraint handling techniques in evolutionary algorithms , 2009, Comput. Sci. Rev..

[2]  Marc Goetschalckx,et al.  A stochastic programming approach for supply chain network design under uncertainty , 2004, Eur. J. Oper. Res..

[3]  Manuel Mateo,et al.  Planning production using mathematical programming: The case of a woodturning company , 2009, Comput. Oper. Res..

[4]  Yi-Feng Hung,et al.  A new formulation technique for alternative material planning—an approach for semiconductor bin allocation planning , 1997 .

[5]  Stefano Giordani,et al.  A fast metaheuristic for scheduling independent tasks with multiple modes , 2009, Comput. Ind. Eng..

[6]  Chen-Fu Chien,et al.  A fuzzy-knowledge resource-allocation model of the semiconductor final test industry , 2009 .

[7]  T. Bashyam,et al.  Competitive capacity expansion under demand uncertainty , 1996 .

[8]  Mitsuo Gen,et al.  Genetic algorithms and engineering optimization , 1999 .

[9]  Lola Esteban,et al.  Strategic Targeted Advertising and Market Fragmentation , 2007 .

[10]  Andrii Gritsevskyi,et al.  Modeling uncertainty of induced technological change , 2000 .

[11]  Manoj Kumar Tiwari,et al.  Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm , 2006, Eur. J. Oper. Res..

[12]  Jang Hee Lee,et al.  Artificial intelligence-based sampling planning system for dynamic manufacturing process , 2002, Expert Syst. Appl..

[13]  Kathrin Klamroth,et al.  Decision Aiding An MCDM approach to portfolio optimization , 2004 .

[14]  Randy L. Haupt,et al.  Practical Genetic Algorithms , 1998 .

[15]  Manoj Kumar Tiwari,et al.  Modelling the slab stack shuffling problem in developing steel rolling schedules and its solution using improved Parallel Genetic Algorithms , 2004 .

[16]  Neslihan Aydogan,et al.  Notes on the Merger Strategy of High versus Low-tech Industries: Complementarities and Moral Hazard , 2002 .

[17]  Kung-Jeng Wang,et al.  Capacity expansion and allocation for a semiconductor testing facility under constrained budget , 2002 .

[18]  Yazid M. Sharaiha,et al.  Heuristics for cardinality constrained portfolio optimisation , 2000, Comput. Oper. Res..

[19]  M.-J. Chen,et al.  Cooperative capacity planning and resource allocation by mutual outsourcing using ant algorithm in a decentralized supply chain , 2009, Expert Syst. Appl..

[20]  J. D. Sherman,et al.  Environmental uncertainty, organizational integration, and new product development effectiveness: a test of contingency theory - A contingency analysis , 1998 .

[21]  Mehmet Barut,et al.  Design and evaluation of a dynamic capacity apportionment procedure , 2004, Eur. J. Oper. Res..

[22]  Jonathan F. Bard,et al.  AN OPTIMIZATION APPROACH TO CAPACITY EXPANSION IN SEMICONDUCTOR MANUFACTURING FACILITIES , 1999 .

[23]  Kathrin Klamroth,et al.  An MCDM approach to portfolio optimization , 2004, Eur. J. Oper. Res..

[24]  Tsung-Rian Chen,et al.  Job shop scheduling with multiple resources and an application to a semiconductor testing facility , 1994, Proceedings of 1994 33rd IEEE Conference on Decision and Control.

[25]  Andrew Higgins,et al.  A simulation model for capacity planning in sugarcane transport , 2005 .

[26]  Philippe Fortemps,et al.  A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[27]  Shu-Cherng Fang,et al.  A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing , 2009 .

[28]  Kuo-Hwa Chang,et al.  A STOCHASTIC PROGRAMMING MODEL FOR PORTFOLIO SELECTION , 2002 .

[29]  S.-M. Wang,et al.  A resource portfolio model for equipment investment and allocation of semiconductor testing industry , 2007, Eur. J. Oper. Res..

[30]  S. Rajagopalan,et al.  Capacity expansion with alternative technology choices , 1994 .

[31]  Reha Uzsoy,et al.  Production scheduling algorithms for a semiconductor test facility , 1991 .

[32]  R. C. Leachman,et al.  A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations , 1996 .

[33]  Alexander Shapiro,et al.  A simulation-based approach to two-stage stochastic programming with recourse , 1998, Math. Program..

[34]  J I Hsu Equipment replacement policy: a survey. , 1990, Hospital materiel management quarterly.

[35]  Laureano F. Escudero,et al.  A stochastic 0-1 program based approach for the air traffic flow management problem , 2000, Eur. J. Oper. Res..

[36]  Shouyang Wang,et al.  A compromise solution to mutual funds portfolio selection with transaction costs , 2001, Eur. J. Oper. Res..

[37]  Selin Özpeynirci,et al.  A note on "A mixed integer programming model for advanced planning and scheduling (APS)" , 2010, Eur. J. Oper. Res..

[38]  Jayashankar M. Swaminathan Tool capacity planning for semiconductor fabrication facilities under demand uncertainty , 2000, Eur. J. Oper. Res..