Smart spare parts management systems in semiconductor manufacturing
暂无分享,去创建一个
Kan Wu | Meimei Zheng | Meimei Zheng | Kan Wu
[1] Yehuda Bassok,et al. Coordination and Flexibility in Supply Contracts with Options , 2002, Manuf. Serv. Oper. Manag..
[2] Detlef Zühlke,et al. Lean Automation enabled by Industry 4.0 Technologies , 2015 .
[3] A. Tsay. The Quantity Flexibility Contract and Supplier-Customer Incentives , 1999 .
[4] Ananth V. Iyer,et al. Quick Response in Manufacturer-Retailer Channels , 1997 .
[5] Christopher S. Tang,et al. Optimal Ordering Decisions with Uncertain Cost and Demand Forecast Updating , 1999 .
[6] R. Durrett. Probability: Theory and Examples , 1993 .
[7] Jay Lee,et al. A Cyber-Physical Systems architecture for Industry 4.0-based manufacturing systems , 2015 .
[8] Marshall L. Fisher,et al. Reducing the Cost of Demand Uncertainty Through Accurate Response to Early Sales , 1996, Oper. Res..
[9] Edward A. Lee. Cyber Physical Systems: Design Challenges , 2008, 2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC).
[10] Adam J. Fleischhacker,et al. Balancing learning and economies of scale for adaptive clinical trials , 2013 .
[11] Deepak Dhungana,et al. Smart factory product lines: a configuration perspective on smart production ecosystems , 2015, SPLC.
[12] Ke Liu,et al. OPTIMAL ORDERING IN A DUAL‐SUPPLIER SYSTEM WITH DEMAND FORECAST UPDATES , 2009 .
[13] Kagermann Henning. Recommendations for implementing the strategic initiative INDUSTRIE 4.0 , 2013 .
[14] Joaquín B. Ordieres Meré,et al. Smart factories in Industry 4.0: A review of the concept and of energy management approached in production based on the Internet of Things paradigm , 2014, 2014 IEEE International Conference on Industrial Engineering and Engineering Management.
[15] Jay Lee,et al. Service Innovation and Smart Analytics for Industry 4.0 and Big Data Environment , 2014 .
[16] Özalp Özer,et al. Inventory Control with Limited Capacity and Advance Demand Information , 2004, Oper. Res..
[17] Xun Xu,et al. Computer-Integrated Manufacturing, Cyber-Physical Systems and Cloud Manufacturing – Concepts and relationships , 2015 .
[18] Brian Tomlin,et al. To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating , 2009 .