Disassembly to order system under uncertainty

This paper presents a multi-criteria optimization model of a disassembly-to-order (DTO) system under uncertainty. The goal of the proposed model is to determine the best combination of the number of each product type to be taken back from the last user and/or collectors. The EOL products are then disassembled for the retrieval of reusable components and materials and resold in order to meet a certain level of demand under a variety of physical, financial and environmental constraints. The surplus components are recycled, stored for usage in subsequent periods or properly disposed. The problem is modeled as a multi-criteria decision-making problem under uncertainty, where the aspiration levels for various goals are more likely to be in the "approximately more (less) than" and/or "more (less) is better" form. We employ fuzzy goal programming technique to solve the problem. When solved, the model provides the number of EOL products to be taken back as well as the number of items reused, recycled, stored and disposed. The values of a host of other performance measures are also obtained, including total profit, materials and items sales revenues, take back cost, transportation costs as well as costs of preparation of EOL products, destructive disassembly, non-destructive disassembly, recycling, storage and disposal. A case example is presented to illustrate the model's implementation.

[1]  R. Narasimhan GOAL PROGRAMMING IN A FUZZY ENVIRONMENT , 1980 .

[2]  Liang Chen,et al.  A new scheme for an automatic generation of multi-variable fuzzy systems , 2001, Fuzzy Sets Syst..

[3]  Eyal Zussman Planning of disassembly systems , 1995 .

[4]  J. Ignizio,et al.  Fuzzy programming with nonlinear membership functions: piecewise linear approximation , 1991 .

[5]  Surendra M. Gupta,et al.  ANALYSIS OF DESIGN EFFICIENCY FOR THE DISASSEMBLY OF MODULAR ELECTRONIC PRODUCTS , 1999 .

[6]  B. Karlsson Fuzzy handling of uncertainty in industrial recycling , 1998, IMTC/98 Conference Proceedings. IEEE Instrumentation and Measurement Technology Conference. Where Instrumentation is Going (Cat. No.98CH36222).

[7]  Chang-Chun Lin,et al.  A weighted max-min model for fuzzy goal programming , 2004, Fuzzy Sets Syst..

[8]  E. Hannan Linear programming with multiple fuzzy goals , 1981 .

[9]  Beatriz A. Gonzalez,et al.  Life cycle assessment in SMES: a fuzzy approach , 2002, Optics East.

[10]  M. Simon,et al.  Disassembly Process Planning , 1993 .

[11]  Liang-Hsuan Chen,et al.  Fuzzy goal programming with different importance and priorities , 2001, Eur. J. Oper. Res..

[12]  Surendra M. Gupta,et al.  A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS , 2002 .

[13]  H. Zimmermann,et al.  Fuzzy Set Theory and Its Applications , 1993 .

[14]  Waiel F. Abd El-Wahed,et al.  A hybrid fuzzy-goal programming approach to multiple objective decision making problems , 2001, Fuzzy Sets Syst..

[15]  Jaroslav Ramík Fuzzy goals and fuzzy alternatives in goal programming problems , 2000, Fuzzy Sets Syst..

[16]  Surendra M. Gupta,et al.  Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..

[17]  Dong-Ho Lee,et al.  Disassembly planning and scheduling: Review and further research , 2001 .

[18]  Surendra M. Gupta,et al.  Disassembly sequence planning for products with defective parts in product recovery , 1998 .

[19]  R. Tiwari,et al.  Fuzzy goal programming- an additive model , 1987 .

[20]  Surendra M. Gupta,et al.  ENVIRONMENTAL CONCERNS AND RECYCLING/DISASSEMBLY EFFORTS IN THE ELECTRONICS INDUSTRY , 1997 .

[21]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[22]  Ajd Fred Lambert,et al.  Disassembly sequencing: A survey , 2003 .

[23]  Yue Yu,et al.  Environmental conscious design support model using fuzzy analytic hierarchy process , 1998 .

[24]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[25]  Alfred J.D. Lambert,et al.  Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .

[26]  Surendra M. Gupta,et al.  An evaluation methodology for disassembly processes , 1997 .

[27]  MengChu Zhou,et al.  Disassembly modeling, planning, and application , 2002 .

[28]  MengChu Zhou,et al.  Design and implementation of an adaptive process planner for disassembly processes , 2000, IEEE Trans. Robotics Autom..

[29]  Surendra M. Gupta,et al.  Disassembly of multiple product structures , 1997 .

[30]  Bijay Baran Pal,et al.  A goal programming procedure for solving problems with multiple fuzzy goals using dynamic programming , 2003, Eur. J. Oper. Res..

[31]  Ujjwal Maulik,et al.  A goal programming procedure for fuzzy multiobjective linear fractional programming problem , 2003, Fuzzy Sets Syst..

[32]  Surendra M. Gupta,et al.  Disassembly of complex product structures with parts and materials commonality , 1997 .

[33]  R. Tiwari,et al.  Priority structure in fuzzy goal programming , 1986 .

[34]  Han-Lin Li,et al.  Comments on "Fuzzy programming with nonlinear membership functions..." , 1999, Fuzzy Sets Syst..