A spread-sheet model for efficient production and scheduling of a manufacturing line/cell
暂无分享,去创建一个
Shahram Taj | Galia Novakova Nedeltcheva | George Pfeil | Michael Roumaya | S. Taj | G. N. Nedeltcheva | George Pfeil | Michael Roumaya
[1] Brian G. Kingsman,et al. The economic lot scheduling problem: theory and practice , 1991 .
[2] Elisabeth Brandl. The multi-item, single-machine scheduling problem with stochastic demands , 2010 .
[3] Edward A. Silver,et al. Operations Research in Inventory Management: A Review and Critique , 1981, Oper. Res..
[4] Anders Segerstedt,et al. Restricted work-in-process: A study of differences between Kanban and CONWIP , 2009 .
[5] Anders Segerstedt,et al. Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand , 2005 .
[6] Manjusri Basu,et al. Determination of EOQ of Multi-Item inventory Problems through nonlinear Goal Programming with penalty Function , 2005, Asia Pac. J. Oper. Res..
[7] Robert C. Leachman,et al. A Heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands , 1988 .
[8] Anders Segerstedt. Escape from the unnecessary : some guidelines for production management , 1999 .
[9] J. Grznar,et al. An optimal algorithm for the basic period approach to the economic lot scheduling problem , 1997 .
[10] Robert C. Leachman,et al. Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics , 1994 .
[11] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[12] C L Doll,et al. AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .
[13] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[14] Paul H. Zipkin. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..
[15] Anders Segerstedt. Lot sizes in a capacity constrained facility with available initial inventories , 1999 .
[16] S. Graves. The Multi-Product Production Cycling Problem , 1980 .
[17] Jeffrey K. Liker,et al. Becoming lean : inside stories of U.S. manufacturers , 1997 .
[18] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[19] Anders Segerstedt. Frequency approach for treating capacity-constrained multilevel production , 2004 .
[20] P. C. Jones,et al. When Is The Economic Lot Scheduling Problem Easy , 1989 .
[21] Anders Segerstedt,et al. A scheduling policy for adjusting economic lot quantities to a feasible solution , 2007, Eur. J. Oper. Res..
[22] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[23] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .
[24] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[25] Jorge Francisco Arinez,et al. An equipment design approach for achieving manufacturing system design requirements , 2000 .
[26] Robert C. Leachman,et al. Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine , 1991 .
[27] Chu‐Hua Kuei,et al. Designing and Managing the Supply Chain Concepts, Strategies, and Case Studies , 2000 .
[28] Kristina Nilsson,et al. Corrections of costs to feasible solutions of economic lot scheduling problems , 2008, Comput. Ind. Eng..
[29] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[30] David F. Pyke,et al. Push and pull in manufacturing and distribution systems , 1990 .
[31] A. Federgruen,et al. The stochastic Economic Lot Scheduling Problem: cyclical base-stock policies with idle times , 1996 .
[32] Pär Brander,et al. Inventory Control and Scheduling Problems in a Single-Machine Multi-Item System , 2005 .
[33] F. Robert Jacobs,et al. Operations and Supply Management , 2006 .
[34] Albert Battersby,et al. Operations Research in Production and Inventory Control , 1965 .
[35] Edward A. Silver,et al. Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach , 2004 .
[36] Anders Segerstedt,et al. Economic lot scheduling problems incorporating a cost of using the production facility , 2009 .
[37] Maurice Bonney,et al. Are push and pull systems really so different , 1999 .
[38] David Et.All. Simchi-Levi. Designing and managing the supply chain: consepts, strategies and case , 2014 .