Seismic performance of a new through rib stiffener beam connection to concrete-filled steel tubular columns: An experimental study

This paper proposes a new moment-resisting connection known as a through rib stiffener beam connection, which is directly passed through a pre-slotted circular column with concrete infill. Four half-scale cruciform specimens with orthogonal beams were tested under cyclic loading. The failure modes, hysteretic performance, rotation capacity, strength and stiffness degradation, ductility, and energy dissipation of the connections were analysed. The effect of different parameters, such as through rib stiffener and beam section size, on the connection performance was investigated. The experimental results indicated that the new through rib stiffener beam connected with circular columns exhibited a large hysteretic enclosed area, good ductility, and excellent energy dissipation. The results proved that the proposed connection satisfies the seismic provisions and ductility design requirements for it to be utilized as moment-resisting frames in a seismically active area.

[1]  Sheng-Fu Tsai,et al.  Seismic behavior of bidirectional bolted connections for CFT columns and H-beams , 2007 .

[2]  Kyung-Jae Shin,et al.  Seismic behaviour of composite concrete-filled tube column-to-beam moment connections , 2008 .

[3]  Bungale S. Taranath,et al.  Seismic Provisions for Structural Steel Buildings, ANSI/AISC 341-10 , 2016 .

[4]  Mjn Priestley,et al.  Seismic Design and Retrofit of Bridges , 1996 .

[5]  Ronald O. Hamburger,et al.  Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications, ANSI/AISC 358-05 , 2006 .

[6]  Donald R. Sherman Designing With Structural Tubing , 1996 .

[7]  null null,et al.  Guidelines for Design of Joints between Steel Beams and Reinforced Concrete Columns , 1994 .

[8]  Atorod Azizinamini,et al.  Experimental behavior of steel beam to CFT column connections , 2001 .

[9]  Reinhard Bergmann,et al.  Design guide for concrete filled hollow section columns under static and seismic loading , 1995 .

[10]  N. E. Shanmugam,et al.  Box-column to I-beam connections with external stiffeners , 1991 .

[11]  Keigo Tsuda,et al.  Design and Construction of Concrete-Filled Steel Tube Column System in Japan , 2003 .

[12]  L. C. Ting,et al.  Design of I-beam to box-column connections stiffened externally , 1993 .

[13]  Yousef.M. Alostaz,et al.  Experimental Behavior of Connections to Concrete-filled Steel Tubes , 1998 .

[14]  Iman Hajirasouliha,et al.  Hysteretic performance of a new blind bolted connection to concrete filled columns under cyclic loading: An experimental investigation , 2013 .

[15]  Seyed Rasoul Mirghaderi,et al.  The rigid seismic connection of continuous beams to column , 2008 .

[16]  Cheng-Chih Chen,et al.  Ductile moment connections used in steel column-tree moment-resisting frames , 2006 .

[17]  Cheng-Chih Chen,et al.  Evaluation of reinforced connections between steel beams and box columns , 2004 .

[18]  Young-Suk Oh,et al.  Behavior of welded CFT column to H-beam connections with external stiffeners , 2004 .

[19]  J. W. Park,et al.  Experimental Studies of Wide Flange Beam to Square Concrete-Filled Tube Column Joints with Stiffening Plates Around the Column , 2005 .

[20]  Shahabeddin Torabian,et al.  I-beam to box–column connection by a vertical plate passing through the column , 2010 .

[21]  Basile G. Rabbat,et al.  Notes on ACI 318-08, building code requirements for structural concrete : with design applications , 2008 .

[22]  Kyung-Jae Shin,et al.  Hysteresis behavior of CFT column to H-beam connections with external T-stiffeners and penetrated elements , 2001 .

[23]  Seng-Lip Lee,et al.  Behaviour of I-beam to box-column connections stiffened externally and subjected to fluctuating loads , 1991 .

[24]  Naoki Tanaka Evaluation of maximum strength and optimum haunch length of steel beam-end with horizontal haunch , 2003 .

[25]  Billie F. Spencer,et al.  Seismic response of extended end plate joints to concrete-filled steel tubular columns , 2013 .

[26]  Atorod Azizinamini,et al.  Design of through beam connection detail for circular composite columns , 1995 .

[27]  N. E. Shanmugam,et al.  Welded Interior Box-Column to I-Beam Connections , 1995 .

[28]  Anil K. Chopra,et al.  Dynamics of Structures: Theory and Applications to Earthquake Engineering , 1995 .

[29]  Ying Qin,et al.  Experimental investigation of new internal-diaphragm connections to CFT columns under cyclic loading , 2014 .

[30]  David P. Thambiratnam,et al.  Cyclic behaviour of concrete filled steel tubular column to steel beam connections , 2002 .

[31]  Brian Uy,et al.  Experimental behaviour of steel reduced beam section to concrete-filled circular hollow section column connections , 2008 .

[32]  Atorod Azizinamini,et al.  Design provisions for connections between steel beams and concrete filled tube columns , 2001 .

[33]  Masayoshi Nakashima,et al.  Steel moment frames for earthquakes in United States and Japan , 2000 .

[34]  Chin-Tung Cheng,et al.  Seismic performance of steel beams to concrete-filled steel tubular column connections , 2003 .

[35]  Gregory A. MacRae,et al.  Experimental investigation of CFT column to steel beam connections under cyclic loading , 2013 .