Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price
暂无分享,去创建一个
[1] Péter Kovács,et al. LEMON - an Open Source C++ Graph Template Library , 2011, WGT@ETAPS.
[2] Tobias Achterberg,et al. SCIP: solving constraint integer programs , 2009, Math. Program. Comput..
[3] Jin-Kao Hao,et al. Simultaneous Vehicle and Crew Scheduling for Extra Urban Transports , 2008, IEA/AIE.
[4] Leena Suhl,et al. A Crew Scheduling Approach for Public Transit Enhanced with Aspects from Vehicle Scheduling , 2008 .
[5] Matteo Fischetti,et al. The Fixed Job Schedule Problem with Spread-Time Constraints , 1987, Oper. Res..
[6] Ingmar Steinzen,et al. Topics in Integrated Vehicle and Crew Scheduling in Public Transport , 2007 .
[7] Dennis Huisman,et al. Integrated and Dynamic Vehicle and Crew Scheduling , 1999 .
[8] Natalia Kliewer,et al. An overview on vehicle scheduling models , 2009, Public Transp..
[9] Leena Suhl,et al. A time-space network based exact optimization model for multi-depot bus scheduling , 2006, Eur. J. Oper. Res..
[10] G. Mitra,et al. Integrated Decision Support Systems for Urban Transport Scheduling: Discussion of Implementation and Experience , 1988 .
[11] Marta Mesquita,et al. Set partitioning/covering-based approaches for the integrated vehicle and crew scheduling problem , 2008, Comput. Oper. Res..
[12] Albert P. M. Wagelmans,et al. Models and Algorithms for Vehicle Scheduling , 1995 .
[13] L. Bodin. ROUTING AND SCHEDULING OF VEHICLES AND CREWS–THE STATE OF THE ART , 1983 .
[14] József Békési,et al. An Integrated Framework for Bus Logistics Management: Case Studies , 2009 .
[15] Knut Haase,et al. An Exact Branch and Cut Algorithm for the Vehicle and Crew Scheduling Problem , 1999 .
[16] Leena Suhl,et al. A Time-Space Network Approach for the Integrated Vehicle- and Crew-Scheduling Problem with Multiple Depots , 2010, Transp. Sci..
[17] Maddalena Nonato,et al. An Integrated Approach to Extra-Urban Crew and Vehicle Scheduling* , 1998 .
[18] Marta Mesquita,et al. Branching approaches for integrated vehicle and crew scheduling , 2009, Public Transp..
[19] D. M. Ryan,et al. Express: Set Partitioning for Bus Crew Scheduling in Christchurch , 1992 .
[20] Jacques Desrosiers,et al. Simultaneous Vehicle and Crew Scheduling in Urban Mass Transit Systems , 1998, Transp. Sci..
[21] Lawrence Bodin,et al. A Matching Based Heuristic for Scheduling Mass Transit Crews and Vehicles , 1983 .
[22] József Békési,et al. Driver scheduling for vehicle schedules using a set covering approach: a case study , 2015 .
[23] Albert P. M. Wagelmans,et al. Models and Algorithms for Single-Depot Vehicle Scheduling , 2001, Transp. Sci..
[24] Dennis Huisman,et al. Models and Algorithms for Integration of Vehicle and Crew Scheduling , 2000, J. Sched..
[25] Dennis Huisman,et al. Multiple-Depot Integrated Vehicle and Crew Scheduling , 2003, Transp. Sci..
[26] Alan A. Bertossi,et al. On some matching problems arising in vehicle scheduling models , 1987, Networks.
[27] Ioannis Patrikalakis,et al. A New Decomposition Scheme of the Urban Public Transport Scheduling Problem , 1992 .
[28] Ralf Borndörfer,et al. A Bundle Method for Integrated Multi-Depot Vehicle and Duty Scheduling in Public Transit , 2008 .
[29] E Tosini,et al. AN INTERACTIVE SYSTEM FOR EXTRA-URBAN VEHICLE AND CREW SCHEDULING PROBLEMS , 1988 .
[30] Samuel J. Raff,et al. Routing and scheduling of vehicles and crews : The state of the art , 1983, Comput. Oper. Res..