The lengthy submission by Klugel (2007b) extends considerably beyond a discussion of our review article (Bommer and Abrahamson, 2006), and we resist the temptation to respond to all the points raised. The author has already challenged the validity of the results of the PEGASOS project (Klugel, 2005) and more recently has presented his general arguments against probabilistic seismic-hazard analysis (PSHA) and for a deterministic approach (Klugel, 2007a). Very little of this is directly relevant to the article on which the author has commented, and we limit ourselves to responding on the key issues of the nature of ground-motion variability and how it should be incorporated into PSHA.
Regarding Klugel’s “Refutation of the Assumptions of Bommer and Abrahamson,” the discussion does not address the assumptions that we made. The only assumptions we made are that the ground-motion residuals follow a lognormal distribution and that the ground-motion model fits the magnitude and distance dependence of the data from which it is was derived. In ground-motion studies the assumption of a lognormal distribution is nearly universal. The results of ground-motion studies are typically shown in ground-motion units ( g ) rather than log( g ). For a lognormal distribution, the mean value in log units corresponds to the median value in units of g . Therefore, it is common practice for ground-motion studies to call the expected ground motion, in units of g , the median ground motion. Klugel (2007b) seems to be unaware of this common practice, and so he says that we have used the term median when we should have used the term mean.
In passing, we do acknowledge that, although it was not a typographical error because the complete sentence is correct, we should have referred to e as the normalized residual in introducing our equation (4) in order to be unambiguous. The …
[1]
Jens-Uwe Klügel,et al.
Comment on “Why Do Modern Probabilistic Seismic-Hazard Analyses Often Lead to Increased Hazard Estimates?” by Julian J. Bommer and Norman A. Abrahamson
,
2007
.
[2]
Julian J. Bommer,et al.
Probability and Uncertainty in Seismic Hazard Analysis
,
2005
.
[3]
Julian J. Bommer,et al.
Why Do Modern Probabilistic Seismic-Hazard Analyses Often Lead to Increased Hazard Estimates?
,
2006
.
[4]
J.-U. Klügel,et al.
Problems in the application of the SSHAC probability method for assessing earthquake hazards at Swiss nuclear power plants
,
2005
.
[5]
Ragnar Sigbjörnsson,et al.
Uncertainty Analysis of Strong-Motion and Seismic Hazard
,
2003
.
[6]
Jens-Uwe Klügel,et al.
Error inflation in Probabilistic Seismic Hazard Analysis
,
2007
.
[7]
C. Allin Cornell,et al.
The Case for Using Mean Seismic Hazard
,
2005
.
[8]
Uncertainty Analysis of Strong-Motion and Seismic Hazard’ by R. Sigbjörnsson and N.N. Ambraseys
,
2004
.