Effective allocation of idle time in the group technology economic lot scheduling problem
暂无分享,去创建一个
[1] Gregory Dobson. The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..
[2] Bret J. Wagner,et al. A search heuristic for the sequence-dependent economic lot scheduling problem , 2002, Eur. J. Oper. Res..
[3] Colin Lewis,et al. Operations Research in Production Planning and Control , 1994 .
[4] L. J. Thomas,et al. Lot Sizing and Sequencing for N Products on One Facility , 1977 .
[5] Robert R. Inman,et al. A practical heuristic for the group technology economic lot scheduling problem , 1990 .
[6] C L Doll,et al. AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .
[7] Ali Akgunduz,et al. A comparative study of heuristic algorithms on Economic Lot Scheduling Problem , 2008, Comput. Ind. Eng..
[8] B. C. Giria,et al. Note on an economic lot scheduling problem under budgetary and capacity constraints , 2004 .
[9] KARLA E. BOURLAND,et al. A comparison of solution approaches for the fixed-sequence economic lot scheduling problem , 1997 .
[10] V. Madhusudanan Pillai,et al. On the feasibility of sequence-dependent economic lot scheduling problem , 2011 .
[11] S. Axsäter. An extension of the extended basic period approach for economic lot scheduling problems , 1987 .
[12] W. Hsu. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .
[13] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .
[14] Paul H. Zipkin. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..
[15] Gregory Dobson,et al. The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..
[16] J. Grznar,et al. An optimal algorithm for the basic period approach to the economic lot scheduling problem , 1997 .
[17] R. W. Haessler. An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem , 1979 .
[18] Dong X. Shaw,et al. Complexity of the ELSP with general cyclic schedules , 1997 .
[19] Inyong Ham,et al. Group Technology: Applications to Production Management , 2011 .
[20] Hyerim Bae,et al. Hybrid genetic algorithm for group technology economic lot scheduling problem , 2006 .
[21] G. Gallego,et al. Strategic investment to reduce setup times in the economic lot scheduling problem , 1995 .
[22] Zbigniew Michalewicz,et al. The use of genetic algorithms to solve the economic lot size scheduling problem , 1998, Eur. J. Oper. Res..
[23] I. Moon. Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions , 1994 .
[24] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[25] William L. Maxwell,et al. The scheduling of economic lot sizes , 1964 .
[26] Avijit Banerjee,et al. Investment policy for multiple product setup reduction under budgetary and capacity constraints , 1996 .
[27] Hark Hwang,et al. Multiproduct economic lot size models with investment costs for setup reduction and quality improvement , 1993 .
[28] Ilkyeong Moon,et al. The Effect of Externalizing Setups in the Economic Lot Scheduling Problem , 1992, Oper. Res..
[29] Edward A. Silver,et al. Hybrid genetic algorithm for the economic lot-scheduling problem , 2002 .
[30] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .