KANBAN DEVS MODELLING, SIMULATION AND VERIFICATION
暂无分享,去创建一个
[1] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .
[2] Yuehwern Yih,et al. Generic kanban systems for dynamic environments , 1994 .
[3] Mahesh Gupta,et al. A system dynamics model of a JIT-kanban system , 1989 .
[4] C. McLean,et al. Data driven design and simulation system based on XML , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..
[5] B. J. Berkley. A simulation study of container size in two-card kanban systems , 1996 .
[6] John H. Blackstone,et al. Simulating a JIT/kanban production system using GEMS , 1991, Simul..
[7] S. Jordan. Analysis and Approximation of a JIT Production Line , 1988 .
[8] Yung-Hsin Wang,et al. An XML-based DEVS Modeling Tool to Enhance Simulation Interoperability , 2002 .
[9] Haldun Aytuḡ,et al. A framework and a simulation generator for kanban-controlled manufacturing systems , 1998 .
[10] James F. Cox,et al. An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .
[11] Yves Dallery,et al. Multiproduct Kanban-like Control Systems , 2002 .
[12] Bernard P. Zeigler,et al. Multifacetted Modelling and Discrete Event Simulation , 1984 .
[13] Wallace J. Hopp,et al. Throughput of a constant work in process manufacturing line subject to failures , 1991 .
[14] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .