Simulations-based and solver-based optimization approaches for batch processes in semiconductor manufacturing
暂无分享,去创建一个
[1] V. Erramilli,et al. Multiple Orders Per Job Compatible Batch Scheduling , 2006, IEEE Transactions on Electronics Packaging Manufacturing.
[2] M. Mathirajan,et al. Scheduling of Batch Processors in Semiconductor Manufacturing – A Review , 2003 .
[3] Reha Uzsoy,et al. Alternative loading and dispatching policies for furnace operations in semiconductor manufacturing: a comparison by simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[4] Stanley B. Gershwin,et al. Performance of a Serial-Batch Processor System with Incompatible Job Families under Simple Control Policies , 2006 .
[5] Pyung-Hoi Koo,et al. Scheduling a single batch processing machine with arbitrary job sizes and incompatible job families , 2005 .
[6] John W. Fowler,et al. Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility , 2002, Proceedings of the Winter Simulation Conference.
[7] E. Beier,et al. Investigation of modified heuristic algorithms for simulation-based optimization , 2007, 2007 30th International Spring Seminar on Electronics Technology (ISSE).
[8] Appa Iyer Sivakumar,et al. Job shop scheduling techniques in semiconductor manufacturing , 2006 .
[9] John W. Fowler,et al. Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops , 2007, Eur. J. Oper. Res..