Risk Engineering: Basic Controlled Interval and Memory Models
暂无分享,去创建一个
[1] Joseph J. Moder,et al. Project Management with CPM and PERT , 1964 .
[2] Ronald A. Howard,et al. Dynamic Probabilistic Systems , 1971 .
[3] Kurt Ernst Weil. The anatomy of decisions , 1977 .
[4] Jean E. Weber. Mathematical analysis; business and economic applications , 1972 .
[5] Tariq Haroon Ahmad,et al. Project management with CPM , 1976 .
[6] Michael F. Driscoll. Instructional Uses of Approximate Convolutions and Their Graphs , 1980 .
[7] J. Hull. The evaluation of risk in business investment , 1980 .
[8] Hon-Shiang Lau,et al. Stochastic Breakeven Analysis , 1978 .
[9] James J. Solberg,et al. The Stochastic Shortest Route Problem , 1980, Oper. Res..
[10] S. Kaplan,et al. On The Quantitative Definition of Risk , 1981 .
[11] Howard Raiffa,et al. Decision analysis: introductory lectures on choices under uncertainty. 1968. , 1969, M.D.Computing.
[12] C. B. Chapman,et al. Large engineering project risk analysis , 1979, IEEE Transactions on Engineering Management.
[13] C. B. Chapman. Modular decision analysis: An introduction in the context of a theoretical basis for consumer demand analysis , 1975 .