Simulation Based Parallel Genetic Algorithm to the Lockage Co-scheduling of the Three Gorges Project
暂无分享,去创建一个
[1] L. Douglas Smith,et al. Decision Tools for Reducing Congestion at Locks on the Upper Mississippi River , 2007, 2007 40th Annual Hawaii International Conference on System Sciences (HICSS'07).
[2] L. Douglas Smith,et al. A Simulation Model to Evaluate Decision Rules for Lock Operations on the Upper Mississippi River , 2007, 2007 40th Annual Hawaii International Conference on System Sciences (HICSS'07).
[3] Paul Schonfeld,et al. Scheduling Interdependent Waterway Projects Through Simulation and Genetic Optimization , 2005 .
[4] Paul Schonfeld,et al. Control Alternatives at a Waterway Lock , 2001 .
[5] Xiaohui Yuan,et al. The rolling horizon procedure on deterministic lockage co-scheduling to the two dams of the Three Gorges Project , 2010, Kybernetes.
[6] Paul Schonfeld,et al. APPROXIMATING DELAYS AT INTERDEPENDENT LOCKS , 1995 .
[7] Paul Schonfeld,et al. Efficiency versus Fairness in Priority Control: Waterway Lock Case , 2001 .
[8] Liu Yunfeng. Application of DFS Algorithm in the Arranging of Three-gorges Permanent Lock Chamber , 2002 .
[9] Feng Xiao-jian. The Mathematic Model and Algorithm for the Co-Scheduling of the Three Gorges Dam and the Gezhouba Dam , 2007 .
[10] Paul Schonfeld,et al. INTEGRATED CONTROL FOR SERIES OF WATERWAY LOCKS , 1998 .