Life Cycle Cost Calculation at the Transport Company in the Supply of Production of Wooden Houses – Case Study

A correct information manager's decision-maker database is a very important element that substantially affects its success. This article presents the potential of using the methodology of life cycle cost calculation in the conditions of a transport company that focuses on the logistic supply of wood-housing producers. The problem is presented through a case study and addresses the decision-making aspect of the decision about acquisition of the transport vehicle. This decision uses time value indicators, inflation rates, average rate of profitability of industry and life cycle costs. Due to the short life cycle of the analyzed period, it was not necessary to consider the ergonomic requirements resulting from the trend of anthropometric dimensions growth.

[1]  Renáta Myšková,et al.  Costs Efficiency Evaluation using Life Cycle Costing as Strategic Method , 2015 .

[2]  Sami Kara,et al.  Life Cycle Cost Analysis of Electrical Vehicles in Australia , 2017 .

[3]  Boris Popesko,et al.  Moderní metody řízení nákladů : jak dosáhnout efektivníhovynakládání nákladů a jejich snížení , 2009 .

[4]  Edeltraud Günther,et al.  Betriebliche Umweltökonomie in Fällen, Band 1, Anwendung betriebswirtschaftlicher Instrumente , 1999 .

[5]  Wahidul K. Biswas,et al.  Cost-effective GHG mitigation strategies for Western Australia’s housing sector: a life cycle management approach , 2016, Clean Technologies and Environmental Policy.

[6]  Fen Ye,et al.  Life-cycle Cost Analysis (LCCA) on Steel Bridge Pavement Structural Composition , 2013 .

[7]  Cornelius Jacobus Fourie,et al.  A decision-making framework for effective maintenance management using life cycle costing (LCC) in a rolling stock environment , 2016 .

[8]  B Rossi,et al.  Comparative life cycle cost assessment of painted and hot-dip galvanized bridges. , 2017, Journal of environmental management.

[9]  Renata Schneiderova Heralova,et al.  Life Cycle Cost Optimization Within Decision Making on Alternative Designs of Public Buildings , 2014 .

[10]  Andrew Starr,et al.  Uncertainty of Net Present Value Calculations and the Impact on Applying Integrated Maintenance Approaches to the UK Rail Industry , 2015 .

[11]  Boris Popesko,et al.  Moderní metody řízení nákladů , 2009 .

[12]  Adolfo Crespo Márquez,et al.  The Maintenance Management Framework , 2009 .

[13]  Libuše Šoljaková Environmentálního manažerské účetnictví a kalkulace výkonů , 2009 .

[14]  Shahaboddin Shamshirband,et al.  Survey of the most influential parameters on the wind farm net present value (NPV) by adaptive neuro-fuzzy approach , 2016 .

[15]  J. F. Armendariz-Lopez,et al.  Life cycle cost of photovoltaic technologies in commercial buildings in Baja California, Mexico , 2016 .

[16]  Beata Grzyl,et al.  The life cycle cost of a building from the point of view of environmental criteria of selecting the most beneficial offer in the area of competitive tendering , 2017 .