Factors Causing Variation Orders in Construction Projects in Gaza Strip (Case Study: Qatar Projects)

Variation orders (VO) have long been an inherent part of the construction industry around the world and especially in Gaza Strip where construction projects suffers from variation orders. The aim of this research is to improve the control on variation order through identifying the root cause factors, and to propose recommendations to prevent or minimize VO as much as possible. To achieve the objectives, a survey was conducted on Qatar projects in the Gaza Strip. 75 questionnaires were distributed to owners, consultants and contractors involved in Qatar projects. A total of 62 completed questionnaires were collected and analyzed with statistical software package SPSS and Average Index formula. The study revealed the key factors as causes effects and the resulting VO effects. This includes; change of schedule by owner, the long waiting time to get approval on drawings, design complexity and difficulty to understand, lack of contractor’s involvement in design, delays in securing site, equipment or materials scarce, and site safety considerations. It is recommended that owners should determine the project schedule by experts or consultants. In addition, consultants are recommended to provide more details of the drawings to make it easy for interpretation. Keywords--Variation Orders, Qatar projects, Gaza Strip, Construction Industry, Owner, Consultant, Contractor

[1]  C. William Ibbs,et al.  PROJECT CHANGE MANAGEMENT SYSTEM , 2001 .

[3]  Kofi Offei-Nyako,et al.  Variation Determinants in Building Construction: Ghanaian Professionals Perspective , 2013 .

[4]  Alia Alaryan,et al.  Causes and Effects of Change Orders on Construction Projects in Kuwait , 2014 .

[5]  Bassam A. Tayeh,et al.  Strategic Planning in Construction Companies in Gaza Strip , 2014 .

[6]  Min Liu,et al.  Causes of Variation in Construction Project Task Starting Times and Duration , 2011 .

[7]  A. S. Alnuaimi,et al.  Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman , 2010 .

[8]  Edward R. Fisk Construction Project Administration , 1978 .

[9]  Ismail Abdul Rahman,et al.  Significant Causes and Effects of Variation Orders in Construction Projects , 2014 .

[10]  Begum Sertyesilisik,et al.  Variations and Change Orders on Construction Projects , 2010 .

[11]  C. Lim THE MALAYSIAN PWD FORM OF CONSTRUCTION CONTRACT , 2013 .

[12]  Abdulghafoor Habib Al-Dubaisi Change orders in construction projects in Saudi Arabia. , 2000 .

[13]  Rangika Halwatura,et al.  Causes of Variation Orders in Road Construction Projects in Sri Lanka , 2013 .

[14]  Faisal Manzoor Arain,et al.  How Design Consultants Perceive Potential Causes of Variation Orders for Institutional Buildings in Singapore , 2005 .

[15]  Galloway,et al.  Journal of Legal Affairs & Dispute Resolution in Engineering and Construction , 2013 .

[16]  Mohammed Alias Yusof,et al.  INVESTIGATION ON THE CAUSES OF VARIATION ORDERS IN THE CONSTRUCTION OF BUILDING PROJECT – A STUDY IN THE STATE OF SELANGOR, MALAYSIA , 2010 .

[17]  Faisal Manzoor Arain,et al.  Subcontractor Prequalification Practices in Palestine , 2010 .

[18]  Donald E. Grierson,et al.  Improving Design Coordination for Building Projects. I: Information Model , 2001 .