Staff planning and scheduling in the service industry: an application to US Postal Service mail processing and distribution centers

............................................................................................................................ vi List of Tables .................................................................................................................... xi List of Figures................................................................................................................. xiii Chapter

[1]  Hendrik Van Landeghem,et al.  The State of the Art of Nurse Rostering , 2004, J. Sched..

[2]  A K Mukherjee,et al.  Lagrangian heuristics for instructor scheduling in executive development programmes , 1997 .

[3]  Jonathan F. Bard,et al.  Equipment scheduling at mail processing and distribution centers , 2005 .

[4]  Jonathan F. Bard Selecting the appropriate input data set when configuring a permanent workforce , 2004, Comput. Ind. Eng..

[5]  Kenneth C. Gilbert,et al.  MULTIDIMENSIONAL ASSIGNMENT PROBLEMS , 1988 .

[6]  Andreas T. Ernst,et al.  Staff scheduling and rostering: A review of applications, methods and models , 2004, Eur. J. Oper. Res..

[7]  Richard C. Larson,et al.  Scheduling workforce and workflow in a high volume factory , 1997 .

[8]  Alon Itai,et al.  On the Complexity of Timetable and Multicommodity Flow Problems , 1976, SIAM J. Comput..

[9]  Hamilton Emmons Work-Force Scheduling with Cyclic Requirements and Constraints on Days Off, Weekends Off, and Work Stretch , 1985 .

[10]  T. Feo,et al.  An algorithm for the manufacturing equipment selection problem , 1991 .

[11]  J. Bard,et al.  A column generation-based approach to solve the preference scheduling problem for nurses with downgrading , 2005 .

[12]  Jonathan F. Bard,et al.  Flight Scheduling and Maintenance Base Planning , 1989 .

[13]  Jonathan F. Bard,et al.  DESIGN OF SEMI-AUTOMATED MAIL PROCESSING FACILITIES , 1993 .

[14]  Hanif D. Sherali,et al.  Improving Discrete Model Representations via Symmetry Considerations , 2001, Manag. Sci..

[15]  Moustapha Diaby,et al.  Development and evaluation of an assignment heuristic for allocating cross-trained workers , 2002, Eur. J. Oper. Res..

[16]  James J. Browne,et al.  Introduction to Employee Scheduling , 1992 .

[17]  M. I. McManus Optimum use of overtime in post offices , 1977, Comput. Oper. Res..

[18]  Lori S. Franz,et al.  Scheduling Medical Residents to Rotations: Solving the Large-Scale Multiperiod Staff Assignment Problem , 1993, Oper. Res..

[19]  Oded Berman,et al.  Optimal workforce configuration incorporating absenteeism and daily workload variability , 1993 .

[20]  Hesham K. Alfares An efficient two-phase algorithm for cyclic days-off scheduling , 1998, Comput. Oper. Res..

[21]  Randolph W. Hall,et al.  Optimized lane assignment on an automated highway , 1996 .

[22]  Andrew J. Mason,et al.  Integrated Simulation, Heuristic and Optimisation Approaches to Staff Scheduling , 1998, Oper. Res..

[23]  Eswaran Subrahmanian,et al.  Staffing and Allocation of Workers in An Administrative Office , 1998 .

[24]  Paolo Toth,et al.  Models and algorithms for a staff scheduling problem , 2003, Math. Program..

[25]  Vasek Chvátal,et al.  A Greedy Heuristic for the Set-Covering Problem , 1979, Math. Oper. Res..

[26]  G. Nemhauser,et al.  Integer Programming , 2020 .

[27]  M. Brusco Solving personnel tour scheduling problems using the dual all-integer cutting plane , 1998 .

[28]  Nicholas Beaumont,et al.  Scheduling staff using mixed integer programming , 1997 .

[29]  Hassen T. Dorrah,et al.  The multidimensional assignment problem with application , 1990, Proceedings of the 33rd Midwest Symposium on Circuits and Systems.

[30]  Teofilo F. Gonzalez,et al.  P-Complete Approximation Problems , 1976, J. ACM.

[31]  Leon S. Lasdon,et al.  Piece-by-piece approach to solving large nonlinear water resources management models , 2001 .

[32]  Jonathan F. Bard,et al.  Staff scheduling in high volume service facilities with downgrading , 2004 .

[33]  Manoj K. Malhotra,et al.  A model for scheduling postal distribution employees , 1992 .

[34]  Stephen E. Bechtold,et al.  Implicit modeling of flexible break assignments in optimal shift scheduling , 1990 .

[35]  Donald F. Rossin,et al.  Overtime schedules for full-time service workers , 1997 .

[36]  Sanjog Misra,et al.  Salesforce design with experience-based learning , 2004, SSRN Electronic Journal.

[37]  Jonathan F. Bard,et al.  Solving large-scale tour scheduling problems , 1994 .

[38]  JONATHAN F. BARD,et al.  Optimizing Aircraft Routings in response to Groundings and Delays , 2001 .

[39]  Jonathan F. Bard,et al.  Staff scheduling at the United States Postal Service , 2003, Comput. Oper. Res..

[40]  T. Aykin Optimal Shift Scheduling with Multiple Break Windows , 1996 .

[41]  Christine Strauss,et al.  An enhanced rostering model for airline crews , 2001, Comput. Oper. Res..

[42]  Michael W. Carter,et al.  Work Force Size and Single Shift Schedules with Variable Demands , 1985 .

[43]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[44]  Michael J. Showalter,et al.  Manpower allocation in U.S. postal facilities: A heuristic approach , 1977, Comput. Oper. Res..