Online Scheduling of Multiproduct Batch Plants under Uncertainty
暂无分享,去创建一个
Christian Schulz | Sebastian Engell | Guido Sand | Rüdiger Schultz | Andreas Märkert | R. Schultz | S. Engell | Christian Schulz | G. Sand | Andreas Märkert
[1] Krzysztof C. Kiwiel,et al. Exact penalty functions in proximal bundle methods for constrained convex nondifferentiable minimization , 1991, Math. Program..
[2] Joseph F. Pekny,et al. The curse of reality — why process scheduling optimization problems are difficult in practice , 2000 .
[3] Rüdiger Schultz,et al. Dual decomposition in stochastic integer programming , 1999, Oper. Res. Lett..
[4] Gintaras V. Reklaitis,et al. Reactive schedule modification in multipurpose batch chemical plants , 1994 .
[5] Stephen J. Wright,et al. Nonlinear Predictive Control and Moving Horizon Estimation — An Introductory Overview , 1999 .
[6] Gintaras V. Reklaitis,et al. A framework for investigating schedule robustness under uncertainty , 1995 .
[7] Matthew H. Bassett,et al. Decomposition techniques for the solution of large-scale scheduling problems , 1996 .
[8] Peter Kall,et al. Stochastic Programming , 1995 .
[9] Christian Schulz,et al. A hierarchical approach to real-time scheduling of a multiproduct batch plant with uncertainties , 2000 .
[10] John R. Birge,et al. Introduction to Stochastic Programming , 1997 .
[11] Linus Schrage,et al. OR Practice - A Scenario Approach to Capacity Planning , 1989, Oper. Res..
[12] Christian Schulz,et al. Approximation of an ideal online scheduler for a multiproduct batch plant , 2000 .
[13] Nilay Shah,et al. Aggregate modelling of multipurpose plant operation , 1995 .
[14] J. M. Pinto,et al. A continuous time MILP model for short term scheduling of batch plants with pre-ordering constraints , 1996 .
[15] Sebastian Engell,et al. Sequencing of batch operations for a highly coupled production process: Genetic algorithms versus mathematical programming , 1998 .
[16] H. P. Williams,et al. Model Building in Mathematical Programming , 1979 .
[17] Gintaras V. Reklaitis. Scheduling approaches for the batch process industries , 1995 .
[18] I. Grossmann,et al. A combined penalty function and outer-approximation method for MINLP optimization : applications to distillation column design , 1989 .
[19] Laurence A. Wolsey,et al. Integer and Combinatorial Optimization , 1988 .
[20] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations */I , 1993 .
[21] D. Duffie,et al. An Overview of Value at Risk , 1997 .
[22] Paul M. Frank,et al. Advances in Control , 1999 .
[23] Donald E. Shobrys,et al. Planning, scheduling and control systems: why cannot they work together , 2000 .
[24] Krzysztof C. Kiwiel,et al. Proximity control in bundle methods for convex nondifferentiable minimization , 1990, Math. Program..
[25] Raymond Hemmecke,et al. Decomposition Methods for Two-Stage Stochastic Integer Programs , 2001 .
[26] C. Pantelides,et al. A simple continuous-time process scheduling formulation and a novel solution algorithm , 1996 .
[27] A. Stuart,et al. Portfolio Selection: Efficient Diversification of Investments , 1959 .
[28] C. Floudas,et al. Global optimization in multiproduct and multipurpose batch design under uncertainty , 1997 .
[29] Gintaras V. Reklaitis,et al. Issues in the use, design and evolution of process scheduling and planning systems , 1997 .
[30] Xueya Zhang. Algorithms for optimal process scheduling using nonlinear models , 1995 .
[31] David Kendrick,et al. GAMS, a user's guide , 1988, SGNM.