Review on Construction and Demolition Waste for Potential Research Trends
暂无分享,去创建一个
[1] Andrew D.F. Price,et al. An investigation of design waste causes in construction , 2008 .
[2] Rajesh K. Singh,et al. A literature review and perspectives in reverse logistics , 2015 .
[3] Hongping Yuan,et al. Trend of the research on construction and demolition waste management. , 2011, Waste management.
[4] M. Lewis,et al. Are Public-Private Partnerships a Healthy Option? A Systematic Literature Review , 2014, Social science & medicine.
[5] Yi Peng,et al. Benchmarking construction waste management performance using big data , 2015 .
[6] C Llatas,et al. A model for quantifying construction waste in projects according to the European waste list. , 2011, Waste management.
[7] R. Bohne,et al. Projection of Construction and Demolition Waste in Norway , 2007 .
[8] Chi Sun Poon,et al. Reducing building waste at construction sites in Hong Kong , 2004 .
[9] Xiaoling Zhang,et al. Estimating and calibrating the amount of building-related construction and demolition waste in urban China , 2017 .
[10] Neeti Garg,et al. A Conceptual Framework for Sustainability Indicators in Retrofitting Existing Housing , 2016 .
[11] Jun Zheng,et al. Dynamic simulation analysis of a construction and demolition waste management model under penalty and subsidy mechanisms , 2017 .
[12] C. Calderini,et al. Material savings through structural steel reuse: A case study in Genoa , 2014 .
[13] M. Rahimi,et al. Sustainable multi-period reverse logistics network design and planning under uncertainty utilizing conditional value at risk (CVaR) for recycling construction and demolition waste , 2018 .
[14] Malek Jedidi,et al. Construction of a Prefabricated Reinforced Concrete Dock of a Fishing Harbor , 2018 .
[15] Jaime Solís-Guzmán,et al. Demolition Waste Management in Spanish Legislation , 2011 .
[16] Stefan Salhofer,et al. Landfill modelling in LCA - a contribution based on empirical data. , 2007, Waste management.
[17] Hjh Jos Brouwers,et al. Construction Waste: Quantification and Source Evaluation , 1996 .
[18] Lei Zhang,et al. Greenhouse gas emissions in building construction: A case study of One Peking in Hong Kong , 2010 .
[19] Jorge de Brito,et al. Use of recycled aggregates from construction and demolition waste in geotechnical applications: A literature review. , 2016, Waste management.
[20] Jane L Hao,et al. The effectiveness of Hong Kong's Construction Waste Disposal Charging Scheme , 2008, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[21] Li yin Shen,et al. Managing construction waste on‐site through system dynamics modelling: the case of Hong Kong , 2008 .
[22] Vivian W Y Tam,et al. On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.
[23] Jukka Lahdensivu,et al. Reusing concrete panels from buildings for building: Potential in Finnish 1970s mass housing , 2015 .
[24] Nicolas Moussiopoulos,et al. Assessing multiple criteria for the optimal location of a construction and demolition waste management facility , 2010 .
[25] J. de Brito,et al. Mechanical behaviour of non-structural concrete made with recycled ceramic aggregates , 2005 .
[26] P. Graham,et al. Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation , 2000 .
[27] Romualdas Bausys,et al. Sustainable Assessment of Alternative Sites for the Construction of a Waste Incineration Plant by Applying WASPAS Method with Single-Valued Neutrosophic Set , 2015 .
[28] Evia O.W. Wong,et al. Promoting sustainable construction waste management in Hong Kong , 2004 .
[29] Giovanni Andrea Blengini,et al. Life cycle of buildings, demolition and recycling potential: A case study in Turin, Italy , 2009 .
[30] Cecília Gravina da Rocha,et al. A discussion on the reuse of building components in Brazil: An analysis of major social, economical and legal factors , 2009 .
[31] Guiwen Liu,et al. Quantifying construction and demolition waste: an analytical review. , 2014, Waste management.
[32] Edward J. Jaselskis,et al. Introduction to the Special Issue on Research Methodologies in Construction Engineering and Management , 2010 .
[33] Albert P.C. Chan,et al. Research Trend of Public-Private Partnership in Construction Journals , 2009 .
[34] A. Passuello,et al. Environmental performance of construction and demolition waste management strategies for valorization of recycled coarse aggregate. , 2021, Journal of environmental management.
[35] Lukumon O. Oyedele,et al. Critical management practices influencing on-site waste minimization in construction projects. , 2017, Waste management.
[36] N. Bertoldo,et al. Environmental Protection Department LLNL NESHAPs 2007 Annual Report , 2008 .
[37] A. Chan,et al. Review of studies on the Critical Success Factors for Public–Private Partnership (PPP) projects from 1990 to 2013 , 2015 .
[38] Liyin Shen,et al. Simulating effects of management measures on the improvement of the environmental performance of construction waste management , 2012 .
[39] Jinbo Song,et al. A review of emerging trends in global PPP research: analysis and visualization , 2016, Scientometrics.
[40] Scott E. Maxwell,et al. Research productivity in psychology based on publication in the journals of the American Psychological Association. , 1987 .
[41] Nilay Cosgun,et al. A study conducted to reduce construction waste generation in Turkey , 2007 .
[42] Gian Andrea Blengini,et al. Resources and waste management in Turin (Italy): the role of recycled aggregates in the sustainable supply mix , 2010 .
[43] Ali M. Memari,et al. Comparative Study On Energy Performance Of Different Commercial Building Wall Systems , 2017 .