The probability distribution of project completion times in simulation-based scheduling
暂无分享,去创建一个
[1] Cliff Schexnayder,et al. Describing a beta probability distribution function for construction simulation , 2005 .
[2] C. Perry,et al. Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis , 1975 .
[3] D. Sculli. The Completion Time of PERT Networks , 1983 .
[4] Foad Farid,et al. Simulation verifies queuing program for selecting loader-truck fleets , 1994 .
[5] Simaan M. AbouRizk,et al. Simplified CPM/PERT Simulation Model , 2000 .
[6] Mete Sirvanci,et al. Stochastic networks and the extreme value distribution , 1990, Comput. Oper. Res..
[7] Kl Wong,et al. The maximum and sum of two beta variables and the analysis of PERT networks , 1985 .
[8] Wayne D. Cottrell,et al. Simplified Program Evaluation and Review Technique (PERT) , 1999 .
[9] Alfredo Ang H.-S.,et al. Probability concepts in engineering planning and design, vol i : basic principles , 1979 .
[10] S. L. Harris,et al. Applied Numerical Methods for Engineers Using MATLAB and C , 1999 .
[11] Dong-Eun Lee. Probability of Project Completion Using Stochastic Project Scheduling Simulation , 2005 .
[12] Hira N. Ahuja,et al. Simulation Model to Forecast Project Completion Time , 1985 .
[13] Vidyadhar G. Kulkarni,et al. Markov and Markov-Regenerative pert Networks , 1986, Oper. Res..
[14] Dimitri Golenko-Ginzburg,et al. A New Approach to the Activity-time Distribution in PERT , 1989 .
[15] Bajis M. Dodin,et al. Bounding the Project Completion Time Distribution in PERT Networks , 1985, Oper. Res..
[16] Cliff Schexnayder,et al. Defining a Probability Distribution Function for Construction Simulation , 2000 .
[17] Cliff Schexnayder,et al. Probability Distribution Functions for Construction Simulation , 2000 .
[18] Simaan M. AbouRizk,et al. Visual interactive fitting of beta distributions , 1991 .
[19] Harris A. Schilling,et al. Applied Numerical Methods for Engineers Using MATLAB , 1999 .
[20] David Arditi,et al. Automated Statistical Analysis in Stochastic Project Scheduling Simulation , 2006 .
[21] Bajis M. Dodin. Approximating the distribution functions in stochastic networks , 1985, Comput. Oper. Res..
[22] K. MacCrimmon,et al. An Analytical Study of the PERT Assumptions , 1964 .
[23] Steven C. Chapra,et al. Numerical methods for engineers: with software and programming applications / Steven C. Chapra, Raymond P. Canale , 2001 .
[24] Yousry H. Abdelkader. Evaluating project completion times when activity times are Weibull distributed , 2004, Eur. J. Oper. Res..
[25] Jane N. Hagstrom,et al. Computing the probability distribution of project duration in a PERT network , 1990, Networks.
[26] W. Edward Back,et al. PROBABILISTIC FORECASTING OF PROJECT PERFORMANCE USING STOCHASTIC S CURVES , 2004 .
[27] S. Abourizk,et al. STATISTICAL PROPERTIES OF CONSTRUCTION DURATION DATA , 1992 .
[28] Dong-Eun Lee,et al. Statistical analyses for simulating schedule networks , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..
[29] J. Kamburowski. Normally Distributed Activity Durations in PERT Networks , 1985 .
[30] Donald L. Fisher,et al. Stochastic pert networks: OP diagrams, critical paths and the project completion time , 1985, Comput. Oper. Res..
[31] Daniel W. Halpin,et al. Planning and analysis of construction operations , 1992 .
[32] Vidyadhar G. Kulkarni,et al. A classified bibliography of research on stochastic PERT networks: 1966-1987 , 1989 .