Integrated control and reactive scheduling for FMSs under power consumption uncertainties
暂无分享,去创建一个
[1] Sanja Petrovic,et al. SURVEY OF DYNAMIC SCHEDULING IN MANUFACTURING SYSTEMS , 2006 .
[2] G. Bachman,et al. Fourier and Wavelet Analysis , 2002 .
[3] D. R. Sule. Production planning and industrial scheduling : examples, case studies, and applications , 2008 .
[4] Chee Khiang Pang,et al. Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties , 2013, Comput. Ind. Eng..
[5] Shih-Cheng Horng,et al. Evolutionary algorithm for stochastic job shop scheduling with random processing time , 2012, Expert Syst. Appl..
[6] Massimo Paolucci,et al. Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops , 2012 .
[7] Frank L. Lewis,et al. Intelligent Diagnosis and Prognosis of Industrial Networked Systems , 2011 .
[8] Manoj Kumar Tiwari,et al. Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems , 2008, Adv. Eng. Softw..
[9] Chee Khiang Pang,et al. Optimization of Total Energy Consumption in Flexible Manufacturing Systems Using Weighted P-Timed Petri Nets and Dynamic Programming , 2014, IEEE Transactions on Automation Science and Engineering.
[10] Datta Lakshya Vaibhav. Introduction to Nanosatellite Technology and Components , 2012 .
[11] Frank L. Lewis,et al. Manufacturing Systems Control Design: A Matrix-based Approach (Advances in Industrial Control) , 2006 .
[12] Bertrand M. T. Lin,et al. Parallel-machine scheduling to minimize tardiness penalty and power cost , 2013, Comput. Ind. Eng..