Economic design of offline inspections for a batch production process

We consider a batch production process that can be either stable or unstable, in which inspection is performed offline after production of the batch is completed. The quality of a batch can be estimated with a desired level of certainty by inspecting only a sample of its units. In order to minimise the expected total cost per batch, which includes the costs of inspection, of false acceptance and of false rejection, we propose an economic inspection plan in which only a fraction of the batches, rather than each batch, is inspected. We prove that the expected total cost is a strictly quasiconvex function of the inspection interval. We establish necessary and sufficient conditions for the optimal inspection interval to be finite and propose an efficient algorithm to obtain its value. We demonstrate for the case of a single-sampling plan where the proposed economic approach outperforms the common procedure of inspecting every batch, and the proposed algorithm is very efficient.

[1]  Tzvi Raz,et al.  Further results in the optimal policy for imperfect inspection in discrete time , 1997 .

[2]  John I. S. Hsu An Economic Design of Skip-Lot Sampling Plans , 1980 .

[3]  Wen Lea Pearn,et al.  A variables sampling plan based on C , 2008, Eur. J. Oper. Res..

[4]  Shaul P. Ladany,et al.  Optimal policy for imperfect inspection in discrete time , 1992 .

[5]  Yale T. Herer,et al.  Off-line inspections under inspection errors , 2009 .

[6]  Chih-Hsiung Wang,et al.  Economic optimization for an off-line inspection, disposition and rework model , 2011, Comput. Ind. Eng..

[7]  Christos G. Cassandras,et al.  Optimal inspection policies for a manufacturing station , 1992 .

[8]  Tzvi Raz,et al.  Economic optimization of off-line inspection , 2000 .

[9]  C. F. Jex,et al.  Economic attribute sampling schemes: a case study , 1986 .

[10]  Herbert Moskowitz,et al.  Multiattribute Bayesian Acceptance Sampling Plans for Screening and Scrapping Rejected Lots , 1984 .

[11]  Panos M. Pardalos,et al.  Approximate solution of weighted MAX-SAT problems using GRASP , 1996, Satisfiability Problem: Theory and Applications.

[12]  M. Mathirajan,et al.  Scheduling of Batch Processors in Semiconductor Manufacturing – A Review , 2003 .

[13]  Israel Tirkel,et al.  The relationship between yield and flow time in a production system under inspection , 2012 .

[14]  Wendell E. Carr Sampling Plan Adjustment for Inspection Error and Skip-Lot Plan , 1982 .

[15]  C. González,et al.  Bayesian acceptance sampling plans following economic criteria: An application to paper pulp manufacturing , 2003 .

[16]  R. Vijayaraghavan,et al.  Procedure for the selection of CSP-M one level skip-lot sampling inspection plans that have a single-sampling plan with acceptance number zero as the reference plan , 1999 .

[17]  Salih O. Duffuaa,et al.  A Concise Review of Lot-by-Lot Acceptance Sampling by Attributes , 1997 .

[18]  Tzvi Raz,et al.  Economic optimization of off-line inspection , 2000 .

[19]  Shey-Huei Sheu,et al.  Economic optimization of off-line inspection with rework consideration , 2009, Eur. J. Oper. Res..

[20]  Yeu-Shiang Huang,et al.  Design of effective inspection schema for imperfect production systems , 2008 .

[21]  K. Schittkowski,et al.  NONLINEAR PROGRAMMING , 2022 .

[22]  Lie-Fern Hsu,et al.  Design of optimal maintenance policies based on on-line sampling plans , 1995 .

[23]  Tzvi Raz,et al.  Economic optimization of off-line inspection in a process subject to failure and recovery , 2005 .

[24]  William G. Ferrell,et al.  Design of economically optimal acceptance sampling plans with inspection error , 2002, Comput. Oper. Res..

[25]  Benjamin W. Wah,et al.  A Discrete Lagrangian-Based Global-Search Method for Solving Satisfiability Problems , 1996, J. Glob. Optim..