Applying activity‐based costing approach for construction logistics cost analysis
暂无分享,去创建一个
[1] Shuai Bin. Optimized Logistics Cost Decisions under the Conditions of Enterprise’s Logistics Service , 2007 .
[2] Stuart F. Heinritz. Purchasing: principles and applications , 1952 .
[3] V. Grover,et al. Transaction cost framework in operations and supply chain management research: theory and measurement , 2003 .
[4] Tst Ng,et al. Optimising time and cost in construction material logistics , 2008 .
[5] C. Daganzo. Supplying a single location from heterogeneous sources , 1985 .
[6] Hale Kaynak,et al. Using replication research for just-in-time purchasing construct development , 2006 .
[7] Richard J. Tersine,et al. Economic Inventory/Transport Lot, Sizing with Quantity and Freight Rate Discounts , 1991 .
[8] Binshan Lin,et al. Supply chain costing: an activity‐based perspective , 2001 .
[9] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[10] Da Dick van Damme,et al. Activity based costing and decision support , 1999 .
[11] Lee J. Krajewski,et al. Optimal Purchase and Transportation Cost Lot Sizing for a Single Item , 1991 .
[12] Amy Z. Zeng,et al. ESTIMATING THE EFFECTS OF CARRIER TRANSIT-TIME PERFORMANCE ON LOGISTICS COST AND SERVICE , 1998 .
[13] Ekambaram Palaneeswaran,et al. Selection matters – in construction supply chain optimisation , 2000 .
[14] Walter Ukovich,et al. Minimization of logistic costs with given frequencies , 1997 .
[15] J. Hurley. Cost and effect , 2001 .
[16] Jim Freeman,et al. Inventory Control and Management , 1992 .
[17] Vito Albino,et al. A neural network application to subcontractor rating in construction firms , 1998 .
[18] L. Bodin. ROUTING AND SCHEDULING OF VEHICLES AND CREWS–THE STATE OF THE ART , 1983 .
[19] Peter E.D. Love,et al. Using improved genetic algorithms to facilitate time-cost optimization , 1997 .
[20] David Frederick Ross,et al. Implementing Supply Chain Management , 1998 .
[21] Tanguy Chouard,et al. Darwin 200: Beneath the surface , 2008, Nature.
[22] Randolph W. Hall,et al. Distribution Strategies that Minimize Transportation and Inventory Costs , 1985, Oper. Res..
[23] Ghang Lee,et al. Process Model Perspectives on Management and Engineering Procedures in the Precast'Prestressed Concrete Industry , 2004 .
[24] Weng Tat Chan,et al. CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .
[25] Jim Thomas. Easy As ABC. , 1987, Nursing standard (Royal College of Nursing (Great Britain) : 1987).
[26] Lisa M. Ellram,et al. TOTAL COST OF RELATIONSHIP -- AN ANALYTICAL FRAMEWORK FOR THE LOGISTICS OUTSOURCING DECISION. , 1997 .
[27] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[28] Stephen Pryke,et al. Construction Supply Chain Management , 2009 .
[29] Dissanayaka Sunil. Mahanama. Comparing procurement and non-procurement related contributors to project performance , 1998 .
[30] Samuel J. Raff,et al. Routing and scheduling of vehicles and crews : The state of the art , 1983, Comput. Oper. Res..
[31] Stephen Pryke,et al. Construction supply chain management : concepts and case studies , 2009 .
[32] D. Lambert,et al. Fundamentals of Logistics Management , 1998 .
[33] Kerry London,et al. Construction Supply Chain Management Handbook , 2008 .
[34] J. Brimson. Activity Accounting: An Activity-Based Costing Approach , 1991 .
[35] Chung-Yee Lee,et al. The Economic Order Quantity for Freight Discount Costs , 1986 .
[36] Hao Hu,et al. An application of genetic algorithms to precast production scheduling , 2001 .
[37] Luca Bertazzi,et al. Minimizing the Total Cost in an Integrated Vendor—Managed Inventory System , 2005, J. Heuristics.
[38] Paul Humphreys,et al. A just‐in‐time evaluation strategy for international procurement , 1998 .
[39] Agata Czarnigowska,et al. Analysis of supply system models for planning construction project logistics , 2005 .
[40] Thomas A. Runkler,et al. Soft computing optimization methods applied to logistic processes , 2005, Int. J. Approx. Reason..
[41] M. Skibniewski,et al. Supply chain optimization tool for purchasing decisions in B2B construction marketplaces , 2007 .
[42] Nicos Christofides,et al. Distribution management : mathematical modelling and practical analysis , 1971 .
[43] Tutu Wegelius-Lehtonen,et al. Performance measurement in construction logistics , 2001 .
[44] Morton Backer,et al. Cost accounting : a managerial approach , 1964 .
[45] R. Kaplan. Activity-based management , 1993 .
[46] Weng Tat Chan,et al. Production Scheduling for Precast Plants using a Flow Shop Sequencing Model , 2002 .
[47] Gul Polat,et al. Factors Affecting the Use of Precast Concrete Systems in the United States , 2008 .
[48] Walter Ukovich,et al. Minimizing Transportation and Inventory Costs for Several Products on a Single Link , 1994, Oper. Res..
[49] Tst Ng,et al. Analysis of resource acquisition cost for construction project logistics , 2007 .
[50] H. Ping Tserng,et al. Developing a resource supply chain planning system for construction projects , 2006 .
[51] Amy Z. Zeng,et al. Developing a framework for evaluating the logistics costs in global sourcing processes , 2003 .
[52] Klaus Gürmann,et al. The determination of cost parameters to achieve optimum stockpiling , 1990 .