Applying activity‐based costing approach for construction logistics cost analysis

Purpose – Construction materials take up a significant proportion of the total construction cost. Without careful planning and controlling on the flow of construction materials, it is possible that the cost of materials may increase unnecessarily. In view of that, this paper aims to examine whether the development of logistics cost analysis can help determine suitable logistics strategies for a project which involves the use of bulky components like precast concrete units.Design/methodology/approach – The cost elements incurred during the logistics process of precast components from the supplier's yard to the construction site are first identified through the activity‐based costing (ABC) approach. Under each element, the resources necessary to fulfil the specific element are analysed. By representing those cost components through the cost functions, simulations can be carried out to determine the logistics cost under different logistic scenarios.Findings – Through the ABC approach, the resources consumed ...

[1]  Shuai Bin Optimized Logistics Cost Decisions under the Conditions of Enterprise’s Logistics Service , 2007 .

[2]  Stuart F. Heinritz Purchasing: principles and applications , 1952 .

[3]  V. Grover,et al.  Transaction cost framework in operations and supply chain management research: theory and measurement , 2003 .

[4]  Tst Ng,et al.  Optimising time and cost in construction material logistics , 2008 .

[5]  C. Daganzo Supplying a single location from heterogeneous sources , 1985 .

[6]  Hale Kaynak,et al.  Using replication research for just-in-time purchasing construct development , 2006 .

[7]  Richard J. Tersine,et al.  Economic Inventory/Transport Lot, Sizing with Quantity and Freight Rate Discounts , 1991 .

[8]  Binshan Lin,et al.  Supply chain costing: an activity‐based perspective , 2001 .

[9]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[10]  Da Dick van Damme,et al.  Activity based costing and decision support , 1999 .

[11]  Lee J. Krajewski,et al.  Optimal Purchase and Transportation Cost Lot Sizing for a Single Item , 1991 .

[12]  Amy Z. Zeng,et al.  ESTIMATING THE EFFECTS OF CARRIER TRANSIT-TIME PERFORMANCE ON LOGISTICS COST AND SERVICE , 1998 .

[13]  Ekambaram Palaneeswaran,et al.  Selection matters – in construction supply chain optimisation , 2000 .

[14]  Walter Ukovich,et al.  Minimization of logistic costs with given frequencies , 1997 .

[15]  J. Hurley Cost and effect , 2001 .

[16]  Jim Freeman,et al.  Inventory Control and Management , 1992 .

[17]  Vito Albino,et al.  A neural network application to subcontractor rating in construction firms , 1998 .

[18]  L. Bodin ROUTING AND SCHEDULING OF VEHICLES AND CREWS–THE STATE OF THE ART , 1983 .

[19]  Peter E.D. Love,et al.  Using improved genetic algorithms to facilitate time-cost optimization , 1997 .

[20]  David Frederick Ross,et al.  Implementing Supply Chain Management , 1998 .

[21]  Tanguy Chouard,et al.  Darwin 200: Beneath the surface , 2008, Nature.

[22]  Randolph W. Hall,et al.  Distribution Strategies that Minimize Transportation and Inventory Costs , 1985, Oper. Res..

[23]  Ghang Lee,et al.  Process Model Perspectives on Management and Engineering Procedures in the Precast'Prestressed Concrete Industry , 2004 .

[24]  Weng Tat Chan,et al.  CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .

[25]  Jim Thomas Easy As ABC. , 1987, Nursing standard (Royal College of Nursing (Great Britain) : 1987).

[26]  Lisa M. Ellram,et al.  TOTAL COST OF RELATIONSHIP -- AN ANALYTICAL FRAMEWORK FOR THE LOGISTICS OUTSOURCING DECISION. , 1997 .

[27]  Chung-Wei Feng,et al.  Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .

[28]  Stephen Pryke,et al.  Construction Supply Chain Management , 2009 .

[29]  Dissanayaka Sunil. Mahanama Comparing procurement and non-procurement related contributors to project performance , 1998 .

[30]  Samuel J. Raff,et al.  Routing and scheduling of vehicles and crews : The state of the art , 1983, Comput. Oper. Res..

[31]  Stephen Pryke,et al.  Construction supply chain management : concepts and case studies , 2009 .

[32]  D. Lambert,et al.  Fundamentals of Logistics Management , 1998 .

[33]  Kerry London,et al.  Construction Supply Chain Management Handbook , 2008 .

[34]  J. Brimson Activity Accounting: An Activity-Based Costing Approach , 1991 .

[35]  Chung-Yee Lee,et al.  The Economic Order Quantity for Freight Discount Costs , 1986 .

[36]  Hao Hu,et al.  An application of genetic algorithms to precast production scheduling , 2001 .

[37]  Luca Bertazzi,et al.  Minimizing the Total Cost in an Integrated Vendor—Managed Inventory System , 2005, J. Heuristics.

[38]  Paul Humphreys,et al.  A just‐in‐time evaluation strategy for international procurement , 1998 .

[39]  Agata Czarnigowska,et al.  Analysis of supply system models for planning construction project logistics , 2005 .

[40]  Thomas A. Runkler,et al.  Soft computing optimization methods applied to logistic processes , 2005, Int. J. Approx. Reason..

[41]  M. Skibniewski,et al.  Supply chain optimization tool for purchasing decisions in B2B construction marketplaces , 2007 .

[42]  Nicos Christofides,et al.  Distribution management : mathematical modelling and practical analysis , 1971 .

[43]  Tutu Wegelius-Lehtonen,et al.  Performance measurement in construction logistics , 2001 .

[44]  Morton Backer,et al.  Cost accounting : a managerial approach , 1964 .

[45]  R. Kaplan Activity-based management , 1993 .

[46]  Weng Tat Chan,et al.  Production Scheduling for Precast Plants using a Flow Shop Sequencing Model , 2002 .

[47]  Gul Polat,et al.  Factors Affecting the Use of Precast Concrete Systems in the United States , 2008 .

[48]  Walter Ukovich,et al.  Minimizing Transportation and Inventory Costs for Several Products on a Single Link , 1994, Oper. Res..

[49]  Tst Ng,et al.  Analysis of resource acquisition cost for construction project logistics , 2007 .

[50]  H. Ping Tserng,et al.  Developing a resource supply chain planning system for construction projects , 2006 .

[51]  Amy Z. Zeng,et al.  Developing a framework for evaluating the logistics costs in global sourcing processes , 2003 .

[52]  Klaus Gürmann,et al.  The determination of cost parameters to achieve optimum stockpiling , 1990 .