Transportation Planning and Scheduling for the 2014 Special Olympics USA Games

The 2014 Special Olympics USA Games were hosted in New Jersey. More than 4,000 athletes competed in 16 sports hosted across 10 locations within a 30-mile radius. We designed timely, convenient, easy-to-follow, and reliable bus routes and schedules to assist thousands of people with intellectual disabilities and their coaches to attend games and special events over seven days under a budget of $600,000.

[1]  Natalia Kliewer,et al.  An overview on vehicle scheduling models , 2009, Public Transp..

[2]  Brian Downs,et al.  A Scheduling and Capable-to-Promise Application for Swift & Company , 2006, Interfaces.

[3]  Bahram Sharif,et al.  Using the Genetic Algorithm for Optimization of the Integrated Urban Transportation Systems , 2011 .

[4]  Jin-Kao Hao,et al.  Transit network design and scheduling: A global review , 2008 .

[5]  Avishai Ceder,et al.  Public-transport vehicle scheduling with multi vehicle type , 2011 .

[6]  E. Cascetta Estimation of trip matrices from traffic counts and survey data: A generalized least squares estimator , 1984 .

[7]  John M Frantzeskakis,et al.  Athens 2004 Olympic Games: Transportation Planning, Simulation and Traffic Management , 2006 .

[8]  William H. K. Lam,et al.  DECOMPOSITION ALGORITHM FOR STATISTICAL ESTIMATION OF OD MATRIX WITH RANDOM LINK CHOICE PROPORTIONS FROM TRAFFIC COUNTS , 1999 .

[9]  D. McFadden MEASUREMENT OF URBAN TRAVEL DEMAND , 1974 .

[10]  M. Hickman,et al.  Public Transit , 1994, Industry, Innovation and Infrastructure.

[11]  Samuel M. Giveen A Taxicab Problem with Time-Dependent Arrival Rates , 1963 .

[12]  Andreas T. Ernst,et al.  Staff scheduling and rostering: A review of applications, methods and models , 2004, Eur. J. Oper. Res..

[13]  Malachy Carey,et al.  A Method for Direct Estimation of Origin/Destination Trip Matrices , 1981 .

[14]  Anthony Wren,et al.  Bus Driver Scheduling — An Overview , 1995 .

[15]  Yih-Long Chang,et al.  Schedule generation in a dynamic job shop , 1990 .

[16]  Xuesong Zhou,et al.  Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variables , 2014 .

[17]  Vickie Dawn Wester A Genetic Algorithm for the Vehicle Routing Problem , 1993 .

[18]  Barrie M. Baker,et al.  A genetic algorithm for the vehicle routing problem , 2003, Comput. Oper. Res..

[19]  Y. Yoshitomi A Genetic Algorithm Approach to Solving Stochastic Job‐shop Scheduling Problems , 2002 .

[20]  Iraklis Lazakis,et al.  Optimizing Ship Routing to Maximize Fleet Revenue at Danaos , 2013, Interfaces.

[21]  Kostas Zografos,et al.  PLATO Helps Athens Win Gold: Olympic Games Knowledge Modeling for Organizational Change and Resource Management , 2006, Interfaces.