CAPEX study for grid dependent multi-layer IP/MPLS-over-EON using relative BV-WSS costs

The impact of the frequency grid on the CAPEX required to deploy a multi-layer IP/MPLS-over-EON is analyzed. Results showing significant savings at the electronic layer motivate the introduction of narrower grids with enhanced BV-WSS.