The decommissioning activities for fixed offshore platforms in Malaysia are expected to rise significantly. For many of the approximate 300 oil platforms, their service life is approaching the end. Thus far, only a handful of offshore platforms in Malaysian waters have been decommissioned mainly due to lack of regulatory framework and weak decommissioning plans. The shortage of decommissioning yards provides another major challenge in managing onshore disposal. With a number of options viable in decommissioning our used platforms, a review of these possibilities is timely. The scope of this paper entails the decommissioning methods particularly in the Gulf of Mexico, where conditions are similar to Malaysian waters. Evaluations of methodology as well as sustainability implications are discussed. The usual methods of decommissioning involve any of these options: complete removal, partial removal, reefing or re-using. Employing the aspects of sustainability as a pillar of the study, a conceptual framework of a viable decommissioning scheme is drawn. It was conceptually found that refurbishing the whole of the structure as a livable hub has its own unique potentials. Given the calm conditions of Malaysian waters and the sturdy design of the platforms, the restored structures hold possibilities either as ocean townships or futuristic cities such as a ‘sea-stead’. This novel idea of decommissioning is presented and further discussed in the paper.
[1]
B. A. Hamzah,et al.
International Rules on Decommissioning of Offshore Installations: Some Observations (ESSAYS IN HONOR OF PROFESSOR KAZUOMI OHUCHI'S RETIREMENT)
,
2003
.
[2]
Mark J. Kaiser,et al.
The Louisiana artificial reef program
,
2006
.
[3]
Les Dauterive,et al.
Rigs-to-Reefs Policy, Progress, and Perspective
,
1999
.
[4]
Patrice Francour,et al.
Fish and Macroinvertebrate Evaluation Methods
,
2000
.
[5]
Dolly Jørgensen.
OSPAR's exclusion of rigs-to-reefs in the North Sea
,
2012
.
[6]
Chih-Pei Chang,et al.
Typhoon Vamei: An equatorial tropical cyclone formation
,
2003
.
[7]
J. N. Sharma,et al.
A Comprehensive Wind , Wave and Current Measurement Program in the South China Sea
,
2010
.
[8]
P. Warne,et al.
Decommissioning - North Sea
,
2004
.
[9]
Svein Fjeld,et al.
FLOATING PRODUCTION SYSTEMS
,
1995
.
[10]
Peter Marshall.
Risk assessment in offshore standards with new metocean criteria withe new meocean criteria
,
2008
.
[11]
John Beattie Paterson.
Decommissioning of Offshore Installations
,
2007
.
[12]
Brian G. Twomey,et al.
Study assesses Asia-Pacific offshore decommissioning costs
,
2010
.
[13]
D. R. Williams,et al.
The Role of Risk Assessment in the Decommissioning of Upstream Oil and Gas Facilities
,
1997
.