Mechanical Analysis of Construction Process for Shallow Weaking Surrounding Rock Multi-Arch Tunnel
暂无分享,去创建一个
[1] Chu Xu-dong. OPTIMAL ANALYSIS OF CONSTRUCTION SCHEMES FOR SHALLOW LARGE SPAN LONGSHAN TWIN TUNNEL , 2005 .
[2] Liu Tao,et al. Model Test and 3-D Numerical Simulation Study on Wall Rock Mass Stability of Double-Arch Tunnel Subject to Partial Press , 2008 .
[3] Li Dan,et al. IN-SITU TESTING STUDY ON LINING SYSTEM OF DOUBLE- ARCHED TUNNEL , 2005 .
[4] Ding Wenqi. Finite element simulation of whole excavation operation of a unequal-span double-arch tunnel , 2004 .
[5] Hu Zi-lin. Analysis on the Structure Stability of the Unsymmetrically Loaded and Connecting-arch Tunnel Caused by Different Construction Orders , 2004 .
[6] Chen Shao. Structural analysis for a joined roof tunnel , 2000 .
[7] Yang Xiaohua. Stress characteristics of middle wall in soft-wreak surrounding rocks highway multiple-arch tunnel under different stress field , 2010 .
[8] Liu Liang. Effects of different excavating sequences on mid-partition of double-arched tunnel , 2004 .