Operational experience for the JT-60 (JAERI Tokamak-60) from FY 1985 to FY 1988 is reported. Various statistics and troubleshooting data provided useful information on the availability and reliability of the JT-60 facilities. As a result, effective countermeasures have been developed to raise operational efficiency. The tokamak machine, magnet power supplies, and control systems are discussed.<<ETX>>

[1]  Hiroshi Shirai,et al.  JT-60 experiments , 1987 .

[2]  K. Suzuki,et al.  Construction and testing of JT-60 , 1987 .

[3]  M. Shimizu,et al.  VACUUM TECHNOLOGICAL EXPERIENCES OF JT-60 OPERATION , 1988 .

[4]  Ryuichi Shimada,et al.  Construction of the JT-60 Grounding System , 1987 .

[5]  T. Ando,et al.  Present status of JT-60 upgrade , 1989, IEEE Thirteenth Symposium on Fusion Engineering.