A Modification of Simplified Drum-Buffer-Rope for Re-entrant Flow Shop Scheduling
暂无分享,去创建一个
[1] H.-H. Wu,et al. A capacity available-to-promise model for drum-buffer-rope systems , 2008 .
[2] T. F. Ho,et al. Heuristic dispatching rule to maximize TDD and IDD performance , 2004 .
[3] Lionel Amodeo,et al. New multi-objective method to solve reentrant hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[4] J.-S. Chen,et al. Minimizing makespan in re-entrant permutation flow-shops , 2003, J. Oper. Res. Soc..
[5] John H. Blackstone,et al. The evolution of a management philosophy: The theory of constraints , 2007 .
[6] Chih-Hung Tsai,et al. Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures , 2010, Expert Syst. Appl..
[7] Maw-Sheng Chern,et al. Multi-family scheduling in a two-machine reentrant flow shop with setups , 2008, Eur. J. Oper. Res..
[8] H.-H. Wu,et al. A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows , 2006 .
[9] Jen-Shiang Chen,et al. Minimizing makespan in reentrant flow-shops using hybrid tabu search , 2007 .
[10] Pisal Yenradee,et al. Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation , 2006 .