Applying a Technical-Economic Approach to Calculate a Suitable Panel Width for Longwall Mining Method
暂无分享,去创建一个
[1] Santanu Majumdar,et al. Cost analysis to determine optimum geometry of a retreating longwall face , 1983 .
[2] Syd S. Peng,et al. Factors considered for increasing longwall panel width , 2013 .
[3] H. Jalalifar,et al. Prediction of face advance rate and determination of the operation efficiency in retreat longwall mining panel using rock engineering system , 2019, International Journal of Coal Science & Technology.
[4] Gholamreza Saeedi,et al. Risk Analysis and Prediction of Floor Failure Mechanisms at Longwall Face in Parvadeh-I Coal Mine using Rock Engineering System (RES) , 2016, Rock Mechanics and Rock Engineering.
[5] M. E. Yetkİn,et al. An optimization approach for panel dimension design in underground coal mines , 2019 .
[6] Jolanta Krystek,et al. Availability analysis of selected mining machinery , 2017 .
[7] John A. Hudson,et al. ROCK ENGINEERING SYSTEMS. THEORY AND PRACTICE , 1992 .
[8] Y. Tsuruoka,et al. How to calculate optimum longwall length , 1980 .
[9] Chengguo Zhang,et al. Impact of Mine Panel Size on Hydraulic Permeability of Weakly Cemented Strata , 2020, Sustainability.
[10] Sanjay K. Sharma,et al. Design of an Optimum Longwall Face for Improved Ground Control: a Review , 2020 .
[11] S. Peng. Longwall Mining , 2019 .
[12] Santanu Majumdar,et al. The application of sensitivity analysis to the optimisation of longwall panel dimensions , 1986 .